| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Finance | ₹7.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.8 L+₹7,859.39 (1.01%)Admitted-Finance | ₹7.8 L+₹7,859.39 (1.01%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M.B. Enterprises L2 | A.S.ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main HT panel after proper switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine. dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required. | 1 | Job | 28,500 ₹33,630 | 28,435 ₹33,553.3 Lowest |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 80,000 ₹94,400 | 78,600 ₹92,748 Lowest |
| 1.03 | Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. | 1 | Job | 29,800 ₹35,164 | 29,645 ₹34,981.1 Lowest |
| 1.04 | Replacement of salica gel. | 1 | Job | 3,400 ₹4,012 | 3,300 ₹3,894 Lowest |
| 1.05 | Checking & matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays testing the same. | 1 | Job | 17,600 ₹20,768 | 17,545 ₹20,703.1 Lowest |
| 1.06 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine. | 1 | Job | 33,300 ₹39,294 | 33,275 ₹39,264.5 Lowest |
| 1.07 | Repairing of tape changer | 1 | Job | 26,700 ₹31,506 | 26,500 ₹31,270 Lowest |
| 1.08 | Repairing of LT Copper Bolt, remettaling and finishing the same as per original shape and size | 4 | Jobs | 98,000 ₹1,15,640 | 96,800 ₹1,14,224 Lowest |
| 1.09 | Filling of T/oil to up to top up level as required to make power | 627 | Ltrs | 94,050 ₹1,10,979 | 93,109.5 ₹1,09,869.21 Lowest |
| 1.10 | P/Fixing of winding protection pad | 1 | Set | 20,000 ₹23,600 | 19,965 ₹23,558.7 Lowest |
Tender Value
Refer Docs
EMD Value
₹15,600
Closing Date
30 Jun 2026, 3:00 pmClosed
Executive Engineer (EM) M-1
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Servicing/ Dehydration of 2000 KVA 11000/ 415-volt Kirloskar make transformer No. 1 at 23 Block Trilokpuri BPS
2026_DJB_294320_7
NIT No-08 EE (EM) M-1/ (26-27)
Open Tender
Electrical Works
Works
30 days
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.5044833980
₹15,600
2 Jul 2026
25 Jun 2026
30 Jun 2026
25 Jun 2026
30 Jun 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main HT panel after proper switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine. dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required. | 1 | Job | 80 | ₹80 |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 80 | ₹80 |
| 1.03 | Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. | 1 | Job | 80 | ₹80 |
| 1.04 | Replacement of salica gel. | 1 | Job | 80 | ₹80 |
| 1.05 | Checking & matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays testing the same. | 1 | Job | 80 | ₹80 |
| 1.06 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine. | 1 | Job | 80 | ₹80 |
| 1.07 | Repairing of tape changer | 1 | Job | 80 | ₹80 |
| 1.08 | Repairing of LT Copper Bolt, remettaling and finishing the same as per original shape and size | 4 | Jobs | 80 | ₹320 |
| 1.09 | Filling of T/oil to up to top up level as required to make power | 627 | Ltrs | 80 | ₹50,160 |
| 1.1 | P/Fixing of winding protection pad | 1 | Set | 80 | ₹80 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_391290.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .