| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.6 CrAccepted-AOC UNIT B2 AUTONAGAR VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530012 | VISAKHAPATANAM | ANDHRA PRADESH | 530012 | ₹62.6 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹69.7 CrRejected-AOC | ₹69.7 Cr | L2 | Rejected-AOC NOT BEING LOWEST |
| 3 | L3₹72 CrRejected-AOC C 2488 SUSHANT LOK PHASE 1 GURGAON 122001 HARYANA | GURUGRAM | HARYANA | 122001 | ₹72 Cr | L3 | Rejected-AOC NOT BEING LOWEST |
| 4 | L4₹74.9 CrRejected-AOC | ₹74.9 Cr | L4 | Rejected-AOC NOT BEING LOWEST |
| 5 | L5₹77.9 CrRejected-AOC | ₹77.9 Cr | L5 | Rejected-AOC NOT BEING LOWEST |
Tender Value
₹64.7 Cr
EMD Value
₹15 L
Closing Date
10 Apr 2024, 6:00 pmClosed
Chief Engineer
Chief Engineer Chennai Zone
ENGINEERING PROCUREMENT CONSTRUCTION OF DEFICIENT MD ACCN FOR OFFRS JCOS AND ORS AT BENGALURU
2024_MES_646661_1
88549/E8
Open Tender
Civil Works
548 days
GE Project Bangalore
As per tender documents
8 documents required · 8 mandatory
₹3,000
Yes
GE (P) Bangalore
₹15 L
Yes
28 May 2024
15 Mar 2024
12 Apr 2024
15 Mar 2024
10 Apr 2024
29 Mar 2024
16 Mar 2024 - 25 Mar 2024
Amount
Planning, Designing and construction of RCC frame buildings / structures including preparation of Detailed Engineering for development of Architectural, Construction and Structural drawings etc, structure analysis & Design Planning, Design and execution of services i.e, Topography survey, Soil investigation, Site clearance and development, Demolition, Internal water supply, Internal electrification, Road/path/culvert, External electric supply, External water supply, Area Drainage, Sewage disposal, Security wall and Fencing gate, Lightening protection, Fire fighting, DG Set, Lift, Rain water harvesting & Electric chimmey complete as per approved drawings and as per the direction of Engr-in-Charge for the following Buildings and structures . The works shall be executed as per Detailed/technical specifications mentioned in tender, DBR etc. Any other work/ services/ utility, which is not included above but, essential for the completion of project, the same shall be deemed to be included in this item Lump sum price worked out by the contractor, shall also include any statuory clearances and certifications required.
Defi Offrs Married Accomodation with servant quarters (20DU's) (S+5) including RCC OH Terrace tank for fire fighting of 25000 ltrs capacity - 4854 sqm (appox)- Block of one
JCOs MD Accn (44 DU's) (S+11) including RCC OH Terrance tank for fire fighting of 5000 ltrs capacity -5860 sqm (appx)- Block of one
OR s MD Accn (132 DU's) (Block-S+11) including RCC OH Terrance tank for fire fighting of 5000 ltrs capacity - 14310.06 sqm (appx)- block of three (3x 4770.02 = 14310.06 Sqm)
Garages for JCOs (245 Sqm) (appx)
Garages for OR s (339 sqm appx -Each ) Two Blocks (678 Sqm) (2 x 339= 678 Sqm)
Sentry Post (10.5 sqm approx -Each) -03 Nos.(3 x 10.5 =31.5 Sqm)
Pump House with rest room and lobby (150.29 sqm approx -Each) - 02 Nos (2 x 150.29 = 300.58 Sqm)
UG SUMP 48000 Ltrs Capacity -01 No
UG SUMP 2,00,000 Ltrs Capacity -01 No
UG SUMP 3,00,000 Ltrs Capacity -01 No
GARAGE BIN -05 Nos
MANNING AND OPERATION OF LIFTS Manning & Operation of electrically operated passenger lift of approved make , type for operation of 8/13 passengers to serve any number of floors by providing services of one lift Attendant [Semi skilled] in each shift on all the days including sunday & holidays in two shifts including taking care of from any pilferage, theft or damage etc. to ensure smooth and trouble free operation of lifts to the entire satisfication of users/department, complete all as specified and as directed by the Engineer-in-charge. Shift Details: The lift shall be operated daily in two shifts.The timings for two shifts of 8 hours each daily i.e. First shift be from 0630 hours to 1430 Hours and Second Shift shall be from 1430 Hours to 2230 Hours. 729 days x 1 Building x 2 shifts/Per day = 1458 shifts - (FMME Pocket) 729 days x 2 Buildings(comprising of 4 blocks) x 2 shifts/Per day = 2916 shifts -(Assay Line Pocket) Note: 02 Persons per shift for 4 Blocks comprising of Two Blocks each in Assay line Pocket
Eleven Months (11 Months ) after completion of the work
Eleven Months (11 Months ) after completion of Sl Item No.2.01 here-in-before.
Two Months (02 Months ) after completion of Sl Item No.2.02 here-in-before.
COMPREHENSIVE MAINTENANCE OF LIFTS Comprehensive Maintenance as per OEM manual and repairs of electrically operated passenger lift of approved make , type for operation for the FMME area one No. 08 passengers and 13 passengers, Assay lines Four No. 08 Passengers and Four Nos 13 passengers of 8/13 passengers to serve any number of floors by providing services to ensure smooth and trouble free operation of lifts to the entire satisfication of users/department, complete all as specified and as directed by the Engineer-in-charge. Comprehensive Maintenance throughout 36 Months including saturdays and sundays for a period of 03 years after expiry of defects liability period complete all as specified and directed. Shift Details: The lift shall be operated daily in two shifts.The timings for two shifts of 8 hours each daily i.e. First shift be from 0630 hours to 1430 Hours and Second Shift shall be from 1430 Hours to 2230 Hours. 729 days x 1 Building x 2 shifts/Per day = 1458 shifts - (FMME Pocket) 729 days x 2 Buildings(comprising of 4 blocks) x 2 shifts/Per day = 2916 shifts -(Assay Line Pocket) Note: 02 Persons per shift for 4 Blocks comprising of Two Blocks each in Assay line Pocket. Note: 02 Persons per shift for 4 Blocks comprising of Two Blocks each in Assay line Pocket.
11 Months after expiry of defects liability period.
11 Months after completion of BOQ Item No.3.01 here-in-before.
11 Months after completion of BOQ Item No.3.02 here-in-before.
03 Months after completion of BOQ Item No.3.03 here-in-before.
NITYA NAND AND SONS CONTRACTORS PVT LTD
Ktech Engineer Builders Co. Pvt. Ltd
AFSON ENGINEERS & CONTRACTORS
Sukhdevraj Sharma Engineers & Contractors Pvt Ltd
KCP INFRA LIMITED
N RAJEGOWDA and CO
MAHINDER PAL CONSTRUCTIONS PVT LTD
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid