| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹4.7 L (4.58%)Rejected-AOC | ₹1.1 Cr+₹4.7 L (4.58%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.1 Cr+₹5.5 L (5.37%)Rejected-AOC | ₹1.1 Cr+₹5.5 L (5.37%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Sunrise enterprises L2 | M/S MAHAMAYA CONSTRUCTION L1 | DEEPA SHARMA L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 294.1 | SqM | 2,646.86 ₹3,154.53 Lowest | 2,646.86 ₹3,154.53 Lowest | 17,645.7 ₹21,030.15 |
| 2.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 50mtrs and earth filling in the depression/pit.)Girth from 300 mm to 600 mm | 7 | Each | 2,765 ₹3,295.33 Lowest | 2,800 ₹3,337.04 | 35,000 ₹41,713 |
| 3.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 50mtrs and earth filling in the depression/pit.)Girth from 600 mm to 900 mm | 3 | Each | 2,100 ₹2,502.78 | 2,070 ₹2,467.03 Lowest | 27,000 ₹32,178.6 |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 74.31 | Cum | 26,009.55 ₹30,998.18 | 28,610.51 ₹34,098.01 | 14,862.6 ₹17,713.25 Lowest |
| 5.00 | Excavation work by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. Ordinary rock | 23.65 | Cum | 13,007.5 ₹15,502.34 | 12,643.76 ₹15,068.83 | 7,095 ₹8,455.82 Lowest |
| 6.00 | Excavation work by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. Hard rock (blasting prohibited) | 11.83 | Cum | 13,261.43 ₹15,804.97 | 13,251.14 ₹15,792.71 | 4,140.5 ₹4,934.65 Lowest |
| 7.00 | Extra for every additional lift of 1.5 m or part thereof in (Ordinary or hard rock). | 5.91 | Cum | 774.21 ₹922.7 | 727.46 ₹866.99 | 472.8 ₹563.48 Lowest |
| 8.00 | Filling with available excavated earth in trenches, plinth and side of foundation in building works with layers not exceeding 20cm in depth including consolidation of each layer by ramming, watering etc, all complete. | 67.83 | Cum | 11,191.95 ₹13,338.57 | 10,271.5 ₹12,241.57 Lowest | 16,957.5 ₹20,209.95 |
| 9.00 | Sand filling in building works in layer not exceeding 20cum including watering, ramming etc, all complete. | 41.28 | Cum | 38,844.48 ₹46,294.85 | 39,971.42 ₹47,637.94 | 18,576 ₹22,138.88 Lowest |
| 10.00 | Providing and Laying in position cement concrete of specified grade including compacting curing etc all complete.1:2:4 mix. (1 cement, 2 coarse sand, 4 graded stone aggregate of 20mm & down size) | 0.53 | Cum | 3,551 ₹4,232.08 Lowest | 3,623.95 ₹4,319.02 | 4,240 ₹5,053.23 |
Tender Value
₹99.2 L
EMD Value
₹2.0 L
Closing Date
18 Feb 2026, 6:00 pmClosed
Gr. Sr. manager (PnC), Rangit Power Station
O/o Gr. Sr. Manager (PnC), Rangit Power Station, Sikkim - 737111
Construction of IRBn Barrack at Rangit Colony of Rangit Power Station
2026_NHPC_895904_1
NH-RPS-CTS011(11)/5/2024-CIVIL TS / 198
Open Tender
Civil Works
Works
365 days
Rangit Power Station, South Sikkim - 737111
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
NHPC Limited
₹2.0 L
16 Sept 2026
28 Jan 2026
26 Feb 2026
28 Jan 2026
18 Feb 2026
28 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 294.1 | SqM | - | - |
| 2 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 50mtrs and earth filling in the depression/pit.)Girth from 300 mm to 600 mm | 7 | Each | - | - |
| 3 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 50mtrs and earth filling in the depression/pit.)Girth from 600 mm to 900 mm | 3 | Each | - | - |
| 4 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 74.31 | Cum | - | - |
| 5 | Excavation work by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. Ordinary rock | 23.65 | Cum | - | - |
| 6 | Excavation work by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. Hard rock (blasting prohibited) | 11.83 | Cum | - | - |
| 7 | Extra for every additional lift of 1.5 m or part thereof in (Ordinary or hard rock). | 5.91 | Cum | - | - |
| 8 | Filling with available excavated earth in trenches, plinth and side of foundation in building works with layers not exceeding 20cm in depth including consolidation of each layer by ramming, watering etc, all complete. | 67.83 | Cum | - | - |
| 9 | Sand filling in building works in layer not exceeding 20cum including watering, ramming etc, all complete. | 41.28 | Cum | - | - |
| 10 | Providing and Laying in position cement concrete of specified grade including compacting curing etc all complete.1:2:4 mix. (1 cement, 2 coarse sand, 4 graded stone aggregate of 20mm & down size) | 0.53 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
TD.pdf
Tender Documents • 13.77 MB
BOQ_941672.xls
BOQ • 0.35 MB
C.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .