Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.7 LAccepted-Finance | L1 | Accepted-Finance Ist Lowest Bidder | |
| 2 | L2₹74.4 L+₹1.7 L (2.31%)Accepted-Finance | L2 | Accepted-Finance 2nd Lowest Bidder | |
| 3 | L3₹77.4 L+₹4.7 L (6.44%)Accepted-Finance | L3 | Accepted-Finance 3rd Lowest Bidder | |
| 4 | L4₹78.5 L+₹5.8 L (7.91%)Accepted-Finance | L4 | Accepted-Finance 4th Lowest Bidder | |
| 5 | L5₹79.6 L+₹6.9 L (9.47%)Accepted-Finance | L5 | Accepted-Finance 5th Lowest Bidder |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
22 Apr 2026, 3:00 pmClosed
Executive Engineer
office of The Executive Engineer, East Road Division (M-212), PWD, Under Akshardham Flyover, Metro Pillar No. 50, Noida Mor, Delhi-91
Improvement of road recently taken from NHAI (from ITO interchange Lalita Park to Ramesh Park Community Centre near FOB and From office of Executive Engineer Electric M-251 to Street No. 8, Ramesh Park) under Sub-Division East Road-I of Division East
2026_PWD_289905_1
22/SE/EAST/CIRCLE/PWD/2025-26
Open Tender
Civil Works - Roads
Works
60 days
East Road-I
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹2.2 L
25 Apr 2026
15 Apr 2026
22 Apr 2026
15 Apr 2026
22 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and for all lift, as directed by Engineer-in-Charge. | |||||
| 1.01 | All kinds of soil | - | Cum | - | - |
| 2Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the Engineer-in-charge; for the following grades of concrete. Note : Extra cement upto 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level : | |||||
| 2.01 | Concrete of M-10 grade with minimum cement content of 220 kg/cum) | - | Cum | - | - |
| 3Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | |||||
| 3.01 | Cement mortar 1:4 (1 cement : 4 coarse sand) | - | Cum | - | - |
| 415 mm cement plaster on the rough side of single or half brick wall of mix : | |||||
| 4.01 | 1:4 (1 cement: 4 fine sand) | - | Sqm | - | - |
| 5Finishing wall with Acrylic smooth exterior paint of required shade: | |||||
| 5.01 | New work (Two or more coat applied @ 1.67/10 sqm over including priming coat of exterior primer applied @ 0.90 litre /10 sqm. | - | Sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
BOQ_384923.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .