Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Fee/PreQual/Technical/Finance | -33.60% | ₹3.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.3 L+₹16,929.47 (5.42%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹3.3 L+₹16,929.47 (5.42%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.4 L+₹27,040.12 (8.66%)Admitted-Fee/PreQual/Technical/Finance | -27.85% | ₹3.4 L+₹27,040.12 (8.66%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.4 L+₹27,510.38 (8.81%)Admitted-Fee/PreQual/Technical/Finance | -27.75% | ₹3.4 L+₹27,510.38 (8.81%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.5 L+₹35,787.01 (11.5%)Admitted-Fee/PreQual/Technical/Finance | -25.99% | ₹3.5 L+₹35,787.01 (11.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.7 L
EMD Value
₹9,419
Closing Date
27 Jul 2026, 6:00 pmClosed
Executive Engineer RnB Division Kralpora
RnB Division Kralpora
Construction of R. Wall at Saribal Road Gazriyal
2026_PWDJK_315455_13
E tendering NIT No 20/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
12 days
Kralpora Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division Kralpora
₹9,419
1 Aug 2026
10 Jul 2026
28 Jul 2026
10 Jul 2026
27 Jul 2026
10 Jul 2026
10 Jul 2026 - 24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. in kinds of soil | 44.05 | Cum | 256.85 | ₹11,314.24 |
| 2 | Supply and filling of dry stone soling in foundation trenches tightly handpacked with hand ramming, watering and compacting to required density including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 3.43 | Cum | 1,000 | ₹3,430 |
| 3 | Providing and laying in position cement concrete 1:4:8 grade (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including curing but excluding the cost of centring and shuttering all work upto plinth level including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 2.29 | Cum | 5,202.9 | ₹11,914.64 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc, including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 123.61 | Sqm | 628.95 | ₹77,744.51 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 40.47 | Cum | 8,422.45 | ₹3,40,856.55 |
| 6 | P/F weep holes of PVC pipes 3" dia in RCC/CC/Masonry work in staggered manner as directed by the Engineer In Charge incl all costs and carriage complete | 18 | Rm | 200 | ₹3,600 |
| 7 | Supply and Filling of Khak bajree/ Quarry Muck for backfilling behing R Walls/ crates work incl ramming, dressing and compacting to required density including cost and carriage of all materials to site of work, with all leads, lifts, loading, unloading, stacking, haulage, and octori taxes. | 25.18 | Cum | 850 | ₹21,403 |
stage.html
html • 0.03 MB
finance_1023562.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1023562.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .