Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹11,700
Closing Date
26 May 2026, 2:00 pmClosed
SE MI NCTPS1 CH 120
OFFICE OF THE SE MI NCTPS1 CHENNAI 120
NCTPS I SE MI circle RM 26 27MPM DnUnit III Dismantling of existing damaged trench platform cutting and removal of damaged handrail walkway platform and supporting steel structures fabrication and erection of the trench platform and handrail walkw
2026_EB_676865_1
CE SE MI NCTPS I 08 26 27
Open Tender
Power/Energy Projects/Products
Works
15 days
works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,700
Yes
27 May 2026
13 May 2026
27 May 2026
13 May 2026
26 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for dismantling of corroded / damaged Trench steel structures near Mill 3A and hand rail, walkway platform in Unit-III. Including consumables, transportation and hire charges of T&P’s. | 2.49 | MT | - | - |
| 2 | Charges for fabrication and erection of trench/ steel structural at ground level near Mill 3A and handrail, walkway platform in Unit-III | 11.85 | MT | - | - |
| 3 | Charges for leading, lifting and transportation of Iron and steel materials from stores to site including hire charges. | 11.85 | MT | - | - |
| 4 | Charges for cutting the given 40 mm OD M.S. pipe (coil pipe) to required length, laying of hand rails in the damaged portions/newly erected platform by welding in the required places. | 212 | Sq.mtr | - | - |
| 5 | Cleaning and painting of one coat of red oxide paint and two coats of Enamel paint for newly erected MS chequered plates and supporting steel structures of approach platform, ladder step threads in mill floor at 4 mtrs level. Including consumables and hire charges for T&P’s. | 310 | Sq.mtr | - | - |
| 6 | Providing RCC 1:2:4 using 12 to 20mm HBG metal around the newly laid trench platform including cost of materials labour, lead, lift, curing, centering labour charges, consumables and T&P’s (One column 0.4m3) | 8 | Nos | - | - |
| 7 | Providing scaffolding arrangement for removal and re-fixing wornout and damaged handrail and walkway platform from 0 m to 18 meter. | 288 | Sq.mtr | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_813318.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .