| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.3 LAccepted-AOC | ₹29.3 L | L1 | Accepted-AOC Less Quoted Estimate Rate |
| 2 | L2₹30.2 LRejected-AOC THIRU K RISHIKESAVAN CONTRACTOR WALAJABAD KANCHEEPURAM DISTRICT | ₹30.2 L | L2 | Rejected-AOC Above Quoted Estimate Rate |
| Sl No | Description | Qty | Unit | K.RISHIJESAVAN L2 | D KANNIGA CIVIL CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Name of Work: Construction of 2m Span RCC Culvert ch 200m, ch 425m and ch 600m in MVW Road to Chinnamadurapakkam Road in Venbakkam Panchayat under NNT 2025-2026 Est Amt 2961000/- | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B | 521.4 | Cum | 313 ₹1.6 L | 263 ₹1.4 L |
| 3.00 | Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification | 36.6 | Cum | 1,931 ₹70,674.60 | 1,881 ₹68,844.60 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 42.09 | Cum | 5,700 ₹2.4 L | 5,650 ₹2.4 L |
| 5.00 | Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 198.72 | Cum | 6,008 ₹11.9 L | 5,958 ₹11.8 L |
| 6.00 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete | 145.8 | Sqm | 597.5 ₹87,115.50 | 547.5 ₹79,825.50 |
| 7.00 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete | 267.9 | Sqm | 1,145 ₹3.1 L | 1,095 ₹2.9 L |
| 8.00 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete | 48.78 | Sqm | 1,145 ₹55,853.10 | 1,095 ₹53,414.10 |
| 9.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 11.7 | Cum | 7,103 ₹83,105.10 | 7,053 ₹82,520.10 |
| 10.00 | Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification | 1.5 | MT | 91,994 ₹1.4 L | 91,944 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹29,610
Closing Date
3 Mar 2026, 3:00 pmClosed
BDO BP
BDO BP
Construction of 2m Span RCC Culvert ch 200m, ch 425m and ch 600m in MVW Road to Chinnamadurapakkam Road in Venbakkam Panchayat under NNT 2025-2026
2026_RDTN_664880_1
4740/2022/A2 Dt 21.02.2026
Open Tender
Civil Works
90 days
BDO WALAJABAD
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹29,610
6 May 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B
Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification
Reinforced Cement Concrete 1:1.5:3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Providing and fixing 6mm Bitumen felt for expansion joint between Bedblock and deck slab
Providing and fixing Kraft Paper for bearing between Bed Block & Deck slab
Providing and fixing 20mm Bitumen Pad between Bed Block & Dirt wall
Providing Weepholes in Brick masonry/stone masonry , plain/reinforced concrete abutment wing wall return wall with 100mm dia AC Pipe
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_798464.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid