Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.4 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹8.3 L
EMD Value
₹83,144
Closing Date
23 Jun 2026, 12:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM AGRA
CC patch repair work from Budhi Raja house to Sampat house in Shakti Nagar, Tajganj (Room No. 70).
2026_DOLBU_1160727_1
02-06-2026/NAGAR NIGAM AGRA/23-06-2026/143
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NAGAR NIGAM
₹83,144
1 Aug 2026
18 Jun 2026
23 Jun 2026
18 Jun 2026
23 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying tack coat with bitumen emulsion using pressure distributor at the of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | 922.5 | Sqm | 11.1 | ₹10,239.75 |
| 2 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous bider @ 3.50 percent by weight of total mix and filler, transporting the hot mix to work site laying with hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause 507 complete in all respects. | 101.48 | MT | 3,555.4 | ₹3,60,801.99 |
| 3 | Providing and laying semi-dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous bider @ 5.00 percent by weight of total mix and filler, transporting the hot mix to work site laying with hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause 508 complete in all respects. | 53.04 | MT | 3,939.6 | ₹2,08,956.38 |
| 4 | P/L GSB with graded stone ballast with stone grit size stone ballast with hand ramming watering including all material labor T&P etc.all complete (NS) | 92.25 | Cum | 2,704 | ₹2,49,444 |
| 5 | Cleaning of floor with in all complete. (NS) | 1 | Job | 2,000 | ₹2,000 |
| 6 | Sub Total (A) | 1 | Rs | 1 | ₹1 |
| 7 | Add/Deduction Rs. For Estimate Figure Amount Match | 1 | Rs | 0.12 | ₹0.12 |
| 8 | Grand Total | 1 | Rs | 1 | ₹1 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.36 MB
BOQ_2175370.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .