Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC DALURBANDH COLLI PANDESWAR PANDESWAR BARDHAMAN WEST BENGAL INDIA 713346 | PANDESWAR | BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹5.6 L+₹16,041.97 (2.93%)Rejected-Finance BARDHAMAN DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹5.9 L+₹41,476.87 (7.56%)Rejected-Finance DVC MORE PANDAVESWAR BARDHAMAN WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹5.5 L
EMD Value
₹6,900
Closing Date
9 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of a belt drive at 7ND and 1L up to 14ND , 800 mm X 182 mtr at RVIIB seam in Kumardihi A colliery under Bankola Area
2023_ECL_289963_1
ECL/GM/BA/E TENDER/23-24/EnM/90 Dt. 28.09.2023
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Kumardihi A Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹6,900
8 Dec 2023
29 Sept 2023
10 Oct 2023
29 Sept 2023
9 Oct 2023
29 Sept 2023
29 Sept 2023 - 3 Oct 2023
Amount
Item Description/ Heading
Transportation of all materials such as , drums gear box, motor , starter and cable and tail end material to site and then installation of drive head with 16 nos of holding bolt jamming at ground and tailened installation by 04 nos of holding bolt jamming
dismantling of 2 pillers structure belt and transportating of all materials such as structure , top & bottom rollers , conveyor belting to site for 2 pillers installation .
Phase wise extension of the belt from 9ND to 14ND , total 5 piller with tail end shifting 5 times in time intervals and commissioning with roof bolting and jamming each time .
Providng materials for the extension of the belt oxygen & DA , nut and washer as required .
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .