Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.5 L+₹52,060.99 (17.2%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.9 L+₹83,053.79 (27.4%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,860
Closing Date
8 Sept 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Construction Of Road To Shamshan Ghat Via Damuna Tawi And Pathwar W.No 6 and 11 Pyt Sagoon Block Nagrota Block Nagrota for the year 2026-2027 under Head DISTRICT CAPEX BUDGET.PRI for the year 2026-27 for the year 2026-27
2026_RDPR_322653_6
e_NIT No. 492-REWJ of 2026-27 dated 31-08-2026
Open Tender
Civil Works
Percentage
60 days
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹7,860
Yes
10 Oct 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m
in width as well as10 sqm on plan including disposal of excavated earth,
leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil : | 352.5 | cum | 91.75 | ₹32,341.88 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:
2.9.1 All kinds of soil : | 42 | cum | 256.85 | ₹10,787.7 |
| 3 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 17.5 | cum | 4,826.5 | ₹84,463.75 |
| 4 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 26.46 | cum | 5,733.6 | ₹1,51,711.06 |
| 5 | SUPPLY of stone | 11.34 | CUM | 937.6 | ₹10,632.38 |
| 6 | Centering and shuttering including strutting,propping etc and removal of form work | 252 | cum | 286.35 | ₹72,160.2 |
| 7 | Sand 20 by MT at an avg distance | 20.42 | cum | 409.94 | ₹8,370.97 |
| 8 | agg 20km by MT at an avg distance | 40.84 | cum | 409.94 | ₹16,741.95 |
| 9 | Add for sign board | 1 | nos | 6,000 | ₹6,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1083236.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .