Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | -15.00% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | -10.50% | ₹1.7 L | L2 | Admitted-Finance |
| 3 | L3₹2.0 LAdmitted-Finance | +3.00% | ₹2.0 L | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
12 Aug 2026, 6:00 pmClosed
ER FAYAZ AHMED SHEIKH
XEN REW OFFICE RAMBAN
as per nit
2026_RDPR_318206_4
NIT NO 25 OF REW RAMBAN 2026 27 BLOCK SANGALDAN UNDER HEAD PRI/DDC
Open Tender
Civil Works
Percentage
30 days
RAMBAN
as per nit
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹3,880
27 Aug 2026
28 Jul 2026
13 Aug 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:25 meter beyond 1 m from cutting edge | 1 | cum | 592.9 | ₹592.31 |
| 2 | Provinding and laying cement concrete 1:5:10 mix | - | cum | 4,826.5 | - |
| 3 | Providing and laying in position cement concrete of specified grade 1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size ) including curing but excluding the cost of centring and shuttering in foundation and plinth | 1 | cum | 5,733.6 | ₹5,727.87 |
| 4 | Dumping of stones incl. cost of stones/ boulders | - | cum | 1,205 | - |
| 5 | Providing and laying in position Reinforcement cement concrete of specified grade 1:1.5:3 (1 cement :1.5 coarse sand :3 graded stone aggregate 40 mm nominal size) in suspended floors, balconies, landings and stair cases, roofs having slope upto 15, upto floor V level, including curing but excluding the cost of centring and shuttering., finishing and reinforcement. | - | cum | 7,272.25 | - |
| 6 | Reinforcement for RCC work incl. straightening, cutting, bending, placing in position and binding all complete with TMT Bars | - | kg | 123 | - |
| 7 | Centering and Shuttering including strutting and propping etc.and removal of form for foundation and plinth | 1 | sqm | 286.35 | ₹286.06 |
| 8 | Steel work in built up tubular ( round square rectangular hollow tubes etc )trusses etc including cutting hoisting fixing in position and applying a priming coat of approved steek primer including welding and bolted with special shaped washers etc complete | - | kg | 138 | - |
| 9 | Providing and fixing G S Sheets roofing incl vertical/ curved surfaces fixed with polymer coated J or L Hooks and nuts 8 mm dia with bitumen 7 G I impet washersall complete 0.63 mm thick with zinc coated not less than 27.5 gm/sq m | - | sqm | 974.05 | - |
| 10 | Providing ridges or hips of width 60 cm over all width in plaains GS sheets fixed with polymer coated Jor L hooks and 8 mm nuts 0.63 mm | - | rmt | 853 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.68 MB
BOQ_1047007.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].