Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹1.2 CrAccepted-AOC | ₹1.2 Cr | 1st | Accepted-AOC 1st lowest |
| 2 | 2nd₹1.4 Cr+₹19.9 L (16.7%)Rejected-Finance | ₹1.4 Cr+₹19.9 L (16.7%) | 2nd | Rejected-Finance 2nd lowest |
| 3 | 3rd₹1.4 Cr+₹22.4 L (18.9%)Rejected-Finance NINGTHOUKHONG WARD NO 05 BISHNUPUR MANIPUR 795126 | BISHNUPUR | BISHNUPUR | MANIPUR | 795126 | ₹1.4 Cr+₹22.4 L (18.9%) | 3rd | Rejected-Finance 3rd lowest |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
24 Sept 2024, 5:00 pmClosed
GM (E), PnC Division
Office of the GM (E), PnC Division, NHPC Ltd., Loktak Project, Komkeirap, Manipur-795124
Repairing of Loktak-Leimatak road from Tiddim Gate to Pump House at Awang Bazar and road from Tiddim Gate to Bamboo Trash Rack, Loktak Project.
2024_NHPC_824199_1
NH-LPS-CDIV/17/2024-CD II/1044
Open Tender
Civil Works - Roads
Works
90 days
NHPC Ltd., Loktak Project
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,180
NHPC Ltd.
₹2.6 L
Yes
30 Nov 2024
3 Sept 2024
28 Sept 2024
3 Sept 2024
24 Sept 2024
3 Sept 2024
Amount
Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m.
Water Bound Macadam and compacting stone Providing, laying, spreading aggregates of specific sizes to water bound macadam Specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means ) Grading-I (Aggregate size-63 mm to 45 mm) (a) Using Screening Crushable type such as Moorum or Gravel.
Filling Pot-holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2) (i) for grading I Material.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on prepared bituminous/granular surface cleaned with mechanical broom.
Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using Viscocity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.) (i) Case - I: Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour.
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats) i) Case - I : Type A
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint confirming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control ): Up to 10 cm in width
Plain/Reinforced cement concrete in Open foundation complete as per drawing and Technical Specifications: PCC Grade M25:PCC Grade M25 using batching plant & Concrete pump
Maintenance of road during the 1st year (Date recognized from the completion date of defect Liability period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 1st year (Start date will be recognized from the completion date of defect Liability period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 1st year (Start date will be recognized from the completion date of defect Liability period of 01 Year).
Maintenance of road during the 2nd year (Date recognized from the completion of 1st year maintenance period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 2nd year (Date recognized from the completion of 1st year maintenance period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 2nd year (Date recognized from the completion of 1st year maintenance period of 01 Year).
Maintenance of road during the 3rd year (Date recognized from the completion of 2nd year maintenance period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 3rd year (Date recognized from the completion of 2nd year maintenance period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 3rd year (Date recognized from the completion of 2nd year maintenance period of 01 Year).
Maintenance of road during the 4th year (Date recognized from the completion of 3rd year maintenance period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 4th year (Date recognized from the completion of 3rd year maintenance period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 4th year (Date recognized from the completion of 3rd year maintenance period of 01 Year).
Maintenance of road during the 5th year (Date recognized from the completion of 4th year maintenance period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 5th year (Date recognized from the completion of 4th year maintenance period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 5th year (Date recognized from the completion of 4th year maintenance period of 01 Year).
Add EPF @ 0.65%
Add CESS @ 1.00%
Add GST @ 18.00%
M/S R.K. Fortune Developers Pvt. Ltd.
M/S L JAYANTAKUMAR SINGH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .