Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC | ₹14.9 L Quoted ₹15.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.2 L+₹1.7 L (11.2%)Rejected-Finance | ₹17.2 L+₹1.7 L (11.2%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹18.0 L+₹2.6 L (16.7%)Rejected-Finance | ₹18.0 L+₹2.6 L (16.7%) | L3 | Rejected-Finance Other than lowest |
| 4 | L4₹18.3 L+₹2.9 L (18.4%)Rejected-Finance | ₹18.3 L+₹2.9 L (18.4%) | L4 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | SUBHASH CHAND GUPTA L2 | M/S Apple constructions L1 | M/S BIJOYA LAXMI ENTERPRISE L4 | L BINOD CONSTRUCTION CO L3 |
|---|---|---|---|---|---|---|---|
| 1.00Schedule 'A' | |||||||
| 1.01 | Demolition of cement concrete in ground floors and pavings not exc. 15 Cm thickness (below/above ground level) including floor finishes complete all as specified and directed. | 10 | Cum | 1,470 ₹14,700 | 1,000 ₹10,000 Lowest | 1,320 ₹13,200 | 2,133 ₹21,330 |
| 2.00 | Demolition of RCC of any description and in any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) complete all as specified and directed. | 3 | Cum | 1,560 ₹4,680 | 1,000 ₹3,000 Lowest | 1,170 ₹3,510 | 1,119 ₹3,357 |
| 3.00 | Demolition of brick work built in cement mortar incl all quions, arches, pillars etc. but excluding ashlar facings dressed stone work and precast concrete articles complete all as specified and directed. | 29 | Cum | 1,320 ₹38,280 | 1,000 ₹29,000 Lowest | 1,290 ₹37,410 | 2,020 ₹58,580 |
| 4.00 | Demolition and breaking up 110/150/200/250 mm bore drain pipes, soil , waste and pipes etc (RCC/ SWG/CI etc) of any description in trenches or floors, including connections and fittings complete all as specified and directed. | 20 | RM | 165 ₹3,300 | 130 ₹2,600 Lowest | 145 ₹2,900 | 145 ₹2,900 |
| 5.00 | Demolition and breaking up of 75/110mm bore PVC/CI pipes & fitted on walls complete all as specified and directed. | 310 | RM | 110 ₹34,100 | 90 ₹27,900 Lowest | 112 ₹34,720 | 129 ₹39,990 |
| 6.00 | Taking down of cement plaster inculding wall finishes in any description on brick or stone wall etc., incl hacking out joints for key scrubbing down with water etc. all as specified and directed. | 35 | SQM | 85 ₹2,975 | 70 ₹2,450 Lowest | 89 ₹3,115 | 90 ₹3,150 |
| 7.00 | Excavation in trenches n exc 1.5 Mtr wide and n exc 1.5 M deep and getting out in hard dense soil (including cutting of roads) for shafts, wells, man holes and for sewage lines and foundation etc n exc 10 Sqm on plan complete all as specified and directed. | 30 | Cum | 515 ₹15,450 | 480 ₹14,400 Lowest | 525 ₹15,750 | 510 ₹15,300 |
| 8.00 | Excavating over areas, n exc .1.5 m deep and getting out soft/loose soil complete all as specified and directed. | 35 | Cum | 444 ₹15,540 | 400 ₹14,000 Lowest | 490 ₹17,150 | 425 ₹14,875 |
| 9.00 | Excavating over areas, exc .1.5 m and n.exc 3.00 m deep and getting out soft/loose soil complete all as specified and directed. | 5 | Cum | 450 ₹2,250 | 425 ₹2,125 Lowest | 455 ₹2,275 | 490 ₹2,450 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
26 Sept 2025, 6:00 pmClosed
GE 869 EWS
GE 869 EWS PIN-913869 C/O 99 APO
REPAIR/MAINT AND CLEANING OF SEWAGE LINE, MANHOLES/SEPTIC TANK/SOAKAGE PITS AT LOWER LEIMAKHONG MIL STN AND KOIRENGEI
2025_MES_726730_1
8695/E8
Open Tender
Civil Works
Item Rate
LEIMAKHONG MIL STN
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹500
GE 869 EWS
₹30,000
Yes
14 Nov 2025
20 Aug 2025
27 Sept 2025
20 Aug 2025
26 Sept 2025
12 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .