| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAccepted-AOC HARIGANJ GANDHAIPUR PAKUR DIST PAKUR | PAKUR | PAKUR | JHARKHAND | ₹30.3 L | L1 | Accepted-AOC Letter No. 99 dated 20.02.2026 of Executive Engineer, Irrigation Division Pakur |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance PAKUR DIST PAKUR | PAKUR | PAKUR | JHARKHAND | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Letter regarding non participation received by bidder |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Letter regarding non participation received by bidder |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance MANIKAPARA DIST PAKUR | PAKUR | PAKUR | JHARKHAND | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Letter regarding non participation received by bidder |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance N A | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Letter regarding non participation received by bidder |
Tender Value
₹30.6 L
EMD Value
₹62,000
Closing Date
22 Dec 2025, 5:00 pmClosed
Executive Engineer, Irrigation Division Pakur
Executive Engineer, Irrigation Division Pakur
Construction Of PCC Road from House of Saddam Hussain to Naya Pokhar Ismail Ansari House at Vill Harihara, Panchayat Nawada, Block Pakur, District Pakur
2025_WRD_107864_1
WRD/Irr.Div.Pakur F2-14/2025-26 (Gr. 01)
Open Tender
Civil Works
90 days
Vill Harihara, Panchayat Nawada
Please Refer Tender Documents
2 documents required · 2 mandatory
₹5,000
₹62,000
26 Feb 2026
16 Dec 2025
24 Dec 2025
16 Dec 2025
22 Dec 2025
16 Dec 2025
Earth work in excavation of foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth so obtained ( 50 m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5m all complete as per sepecification and direction of E/I . SOR WRD part-B pageno.-119(6.1.8)
Earth work in excavation of foundation trenches of toe wall, spillway, head regulator, outlets, intake wells etc, as per designed section in ordinary of soft rock(where blasting is not needed) (vide classification of soil itam-C) with disposal of soil ( beyond 50m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5m as per specification and direction of E/I. (5.1.15.2) Part B, WRD, page no.100.
Providing and laying in position cement concrete of specified grade 1:2:4 (1cement :2coarse sand (Zone-iii):4grade stone aggregate 20mm nominal size ) part -B , BCD -5.3.1.2 .
Providing ramdom rubble stone masonary in c.m. (1:4) in foundation and plinth with hammer dressed stone of less then 0.03 m3 in volume and clean coarse sand of F.M.2.to 2.5 including cost of screening , racking out joints, to 20mm,depth, curing taxes and royality all complete as per bulding specification and direction of E/I (5.2.28) PART A PAGE 204 .
Providing ramdom rubble stone masonary in c.m. (1:4) in superstructure and with hammer dressed stone of less then 0.03 m3 in volume and clean coarse sand of F.M.2.to 2.5 including cost of screening of materials,Scaffolding, racking out joints, to 20mm,depth, curing texas and royality all complete as per bulding specification and direction of E/I (5.2.31) PART A PAGE 204 .
Providing and laying cement concrete in retaining walls,return walls ,walls (any thickness) including attached pilasters, columns,piers, abutments, pillars ,posts,struts,buttresses,string or lacing courses , parapets, cooping, bed blocks,anchor blocks ,plain window sills, illets , sunken floor etc .up to flor five level ,excluding the cost of centering ,shuttering and finishing :-1:2:4 (1 cement: 2 coarse sand (zone-iii) : 4 graded stone aggregate 20mm nominal size . part -B , BCD -(5.3.2.2 .
Providing centering and shuttering including strutting propping etc .removal of form for foundation work as per specification and direction of E/I ( 5.3.17.1) .
Providing centering and shuttering including strutting propping etc .removal of form for Superstructure work as per specification and direction of E/I ( 5.3.17.5) .
Providing 25 mm cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening ,curing,with all leads and lifts of water scaffolding taxes and royalty all . complete job as per building specification and direction of E/I ( 5.7.12) PART A PAGE 200
Providing 1.5 mm thick cement punning including curing carriage of water with leads and lift as per bulding specification and direction of E/I ,(5:7:11) PART A Page-200
Earth work in filling in foundation treanches or banks filling of masonry structures with suitable earth in layers not exceeding 150 mm thick well watered,rammed and fully compacted and finally dressed with earth obtained from excavation of foundation treanch and kept at a lead of 30m and initial lift of 1.5 m complete as per specification and direction of E/I (6.1.16) part -B WRD PAGE 120
Providing weep holes in structures- all complete as per specification and direction of E/I (6.7.6)
Providing dewatering by 10 hp diesel pump set including P.O.L (SL NO-10,PM-29,P-83 WRD PART-B
Separation Membrane of impermeable plastic sheeting 125 micron thick
Cement Concrete Pavement,Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering,- all work upto plinth level. 1:1.5:3, 20 mm nominal size
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
Carriage of materials by mechanical transport including loading, unloading and stacking etc. to work site. (a) Cement & Steel
(b) Sand
(c) stone chips
(d) Boulder
Labour Cess @ 1%
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_145668.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
Tendernotice_2.pdf
PDF • 0.75 MB
Tendernotice_3.pdf
PDF • 0.22 MB
Tendernotice_4.pdf
PDF • 1.66 MB
BOQ_145668.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid