Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.1 LAccepted-AOC | ₹17.1 L Quoted ₹17.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹17.3 L+₹8,229.76 (0.48%)Rejected-Finance 1 VPO BHERIAN MUKLAN HISAR 125004 | HISAR | HISAR | HARYANA | 125004 | ₹17.3 L+₹8,229.76 (0.48%) | 2 | Rejected-Finance L2 |
| 3 | 3₹18.2 L+₹96,081.38 (5.58%)Rejected-Finance 346 MANPHOOL NAGAR BARBALI DHANI NEAR HOLY ANGEL HIGH SCHOOL HISAR | HISAR | HARYANA | ₹18.2 L+₹96,081.38 (5.58%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | THE JDS COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD L2 | THE KUMHARIA NEW CO-OP LABOUR & CONSTRUCTION SOCIETY LIMITED FATEHABAD L1 | THE MAHADEV CO OP L & C SOCIETY LTD L3 |
|---|---|---|---|---|---|---|
| 1.10 | Miscellaneous work and other allied civil works i.e. Costruction of Ramp work, Brick toe wall and M.S. Work in the S/stn area i/c cost of all material, labour men and machinery complete in all respects as per directions of the Engineer Incharge. (The payment shall be made on actual work Basis) | 2.5 | job | 3,00,000 ₹7,50,000 Lowest | 3,10,000 ₹7,75,000 | 3,21,000 ₹8,02,500 |
| 1.20 | Recovery of steel Scrap | 327.36 | nos | 40 ₹-13,094.4 | 35 ₹-11,457.6 | 31 ₹-10,148.16 Lowest |
Tender Value
₹18.2 L
EMD Value
₹36,500
Closing Date
4 Jun 2026, 11:00 amClosed
SUDEEP
XEN/Civil Work, Hisar
Civil works to prevent the 33 kV S/Stn. Shekhupur Sottar (Fatehabad) from flood water due to located in low lying and flood prone area. It also included the cost of Earth filling and other allied civil works.
2026_HBC_525351_1
2026BAD06C50 07F1 4D11 AE04 03FEE7B086861035DHB
Open Tender
Civil Works
Works
60 days
SHEKHUPUR SOTAR
AS PER CBD
2 documents required · 2 mandatory
₹2,540
₹36,500
Yes
21 Aug 2026
29 May 2026
5 Jun 2026
29 May 2026
4 Jun 2026
29 May 2026
29 May 2026 - 4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Miscellaneous work and other allied civil works i.e. Costruction of Ramp work, Brick toe wall and M.S. Work in the S/stn area i/c cost of all material, labour men and machinery complete in all respects as per directions of the Engineer Incharge. (The payment shall be made on actual work Basis) | 2.5 | job | - | - |
| 1.2 | Recovery of steel Scrap | 327.36 | nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_604310.xls
BOQ • 0.28 MB
NIT46Corr.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .