Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Accepted by BEC |
| 2 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
1 Jan 2024, 2:00 pmClosed
Chief_Engineer_PWD_Roads_Assam_Chandmari_Ghy-03
O/o The CE PWRD (Roads) Assam Chandmari Ghy-3
Maint/MMPPNA/2023-24/182_Construction of RCC Bridge cum Sluice Gate of 1_10m on Sahpur on Chamata-Kaithalkuchi Road under Mukhya Mantrir Pakipath Nirman Aachani for the year 2023-24 in Nalbari District
2023_PWD_34868_56
CE/Maint/MMPPNA/01/2023-24/1
Open Tender
Civil Works – Roads
Item Rate
365 days
Nalbari
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,100
₹4.1 L
Yes
O/o The CE PWD (Roads) Assam Chandmari Ghy-3
8 Apr 2024
21 Dec 2023
2 Jan 2024
22 Dec 2023
1 Jan 2024
22 Dec 2023
22 Dec 2023 - 30 Dec 2023
22 Dec 2023
Amount
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.II ) by mechanical means. B) RCC
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Meansi) in ordinary soil i) upto 3 m depth
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) as per MORTH Section No. 1100 & 170 Pile diameter = 1000 mm
Cement concrete for reinforcement concrete in pile cap complete as per drawing and technical specifications of MORTH section no 1100,1500 & 1700 A. RCC grade M- 35 Case I: Using concrete mixer
Levelling course for Pile cap Providing and Lying of PCC M-20 levelling course 100mm thick below the pile cap. As per drawing and technical specifications of MORTH section
Supplying, fitting and placing TMT IS 1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications as per MORTH clause 1600 TMT IS 1786 Fe500 D Primary producer (TATA/SAIL/ESSER STEEL /JINDAL STEEL/SHYAM STEEL or equivqlent
Plain / Reinforced Cement concrete in substructure complete as per drawing and Technical Specificationas clause 1500,1700&2200 H) RCC Grade M 35 i) Height upto 5.0m
Plain / Reinforced Cement concrete in substructure complete as per drawing and Technical Specificationas clause 1500,1700&2200 ii) RCC Grade M35 Height 5m up to 10.0m
Supplying, fitting and placing TMT IS 1786(Fe500) bar reinforcement in foundation complete as per drawing and technical specifications as per MORTH clause 1002,1005,1010,1202
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 i). Granular material
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification including steel shuttering formwork. For T beam and slab, 1) Height iupto 5.0 m
E) PSC M 40 case I(ii) For solid slab Super Structure 1) Height iupto 5.0 m
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications
Providing and laying cement concrete wearing coat M 30 gradeincluding reinforcement complete as per drawing and technical specifications clauses 800,1206.3
Drainage Spouts complete as per approved drawing and technical specifications Clause 1209
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211
Reinforced cement concrMS ete approach slab including reinforcement and formwork complete as per drawing and Technical specification MS bar IS 1786 (Fe 250) Secondary Producer
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).
Providing and laying Pitching on slopes laid over prepared filter media for embankment protection complete as per drawing and Technical specifications
Providing and laying Filter material underneath pitching in slopes for embankment protection complete as per drawing and Technical specification
Boulder apron laid in (Providing and laying of boulder apron laid in made with in including 10% extra for laps and joints laid with stone boulders weighting not less than 40Kg each.)
Construction of temporary Bamboo bridge of 3.70m clear road way with Bholuka or Barua Bamboo post 5nos. in each rows driven at least180cm. below ground level and rows not more than 150cm apart from center to center Bholuka or Barua Bamboo dham longitudinal groth both closely placed and tied with half bamboo 90cm to 120cm apart in both layers and ttwo layers of jati bamboo chattais ( top layer should be digonally woven), 70 mm to 100 mm thick brushwood in between chattias should be tied with half jati bamboo on both ends, bamboo railing with bholuka or barua bamboo post placed at150cm apart jati or betua bamboo hand rails of two lines both side of every alternate rows.All tying must be done with cane or coir string and only mature bamboo should be used in work..
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Private Land
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Private Land
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading I Material
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 .By Manual Means
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Bitumen Emulsion With cold mix Binder Ezee PC (MS) (As per IRC : SP : 100 -2014) to required line, grade and level to serve as wearing course on a per Technical Specification and through credible technology partners duly licensed by CRRI. Seal Coat
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Bitumen Emulsion With cold mix Binder Ezee PC (MS) (As per IRC : SP : 100 -2014) to required line, grade and level to serve as wearing course on a per Technical Specification and through credible technology partners duly licensed by CRRI. Seal Coat
Earthwork in excavation in foundation of head works in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). a) In all types of soils (except soil mixed with gravel and boulders) without dewatering (i) For normal lead of 30 M and lift of 1.50 M Foundation of abutment and return walls
b) In all types of soils (except soil mixed with gravel and boulders) with dewatering Foundation of abutment and return walls
Supply of Z-type Sheet Pile of effective width 0.69 M, thickness 8 mm and average weight 68.30 Kg/M including loading and unloading.
Driving 'Z' type steel sheet pile of 0.69 M effective width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted).
C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). With dewatering P.C.C layer below abutment wall and return walls,
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed. 16 mm dia bars:- For vertical links of pile cap,
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). B) Without dewatering :- Above base of abutment and return walls,
CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing including dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying, fabricating, fitting and fixing steel gates of cross and head regulator as per design and drawing including supplying, fabricating, fitting, fixing of operating plateform including supplying steel beam, channel sections, rubber seal etc. embedded partly where necessary and manually operated hoisting equipments including carriage of all materials to the work site complete as directed.
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M). Back side of abutment walls,
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .