Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹2.7 L+₹5,605 (2.15%)Rejected-AOC AT KATHARA PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | 2 | Rejected-AOC L-2 | |
| 3 | 3₹2.7 L+₹5,852.80 (2.25%)Rejected-AOC OLD BDO OFFICE DHORI PHUSO PO DHORI DIST BOKARO JHARKHAND | DHORI | BOKARO | JHARKHAND | 3 | Rejected-AOC L-3 |
| Sl No | Description | Qty | Unit | M/s. SARSWATI ENTERPRISES, KATHARA L2 | M/S. MANISHA ENTERPRISES L1 | K K Traders L3 |
|---|---|---|---|---|---|---|
| 1.01 | Primary copper coil rewinding | 80 | kg | 1,270 ₹1,01,600 | 1,250 ₹1,00,000 Lowest | 1,250 ₹1,00,000 Lowest |
| 1.02 | Secondary copper coil rewinding | 70 | kg | 1,270 ₹88,900 | 1,250 ₹87,500 Lowest | 1,250 ₹87,500 Lowest |
| 1.03 | Voltage regulator replacement consisting of 15 kg copper | 15 | kg | 1,270 ₹19,050 | 1,250 ₹18,750 Lowest | 1,250 ₹18,750 Lowest |
| 1.04 | Terminal lead consisting of copper | 20 | Nos | 1,270 ₹25,400 | 1,250 ₹25,000 Lowest | 1,250 ₹25,000 Lowest |
| 1.05 | Regulator switch | 4 | Nos | 2,050 ₹8,200 | 2,000 ₹8,000 Lowest | 2,000 ₹8,000 Lowest |
| 1.06 | New bush changing | 4 | m | 1,550 ₹6,200 | 1,500 ₹6,000 Lowest | 2,000 ₹8,000 |
| 1.07 | Insulation cost 15% of item no.1,2,3,4 | 1 | Nos | 35,000 ₹35,000 | 34,600 ₹34,600 Lowest | 36,000 ₹36,000 |
| 1.08 | Denting and painting | 2 | Nos | 5,100 ₹10,200 | 5,000 ₹10,000 Lowest | 5,500 ₹11,000 |
| 1.09 | Tools and tackles | 1 | Nos | 5,050 ₹5,050 | 5,000 ₹5,000 Lowest | 5,500 ₹5,500 |
| 1.10 | Supervisor 1 No. x 2 shift x 10 days | 20 | Nos | 674 ₹13,480 Lowest | 674 ₹13,480 Lowest | 675 ₹13,500 |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
1 Dec 2025, 6:00 pmClosed
PROJECT ENGINEER (EXCV), JARANGDIH OCP
OFFICE OF THE PROJECT OFFICER, JARANGDIH OCP, KATHARA AREA,CENTRAL COALFIELDS LIMITED,PIN 829113
Repairing of oil cooled and air cooled welding machine (Volt-440, Amp-350) of HEMMs workshop of Jarangdih Colliery.
2025_CCL_347716_1
JRD/PE/Excv/E-TENDER/25-26/302
Open Tender
Excavation Department Work
Item Rate
12 days
JARANGDIH OCP, KATHARA AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,300
5 Dec 2025
19 Nov 2025
2 Dec 2025
20 Nov 2025
1 Dec 2025
20 Nov 2025
20 Nov 2025 - 1 Dec 2025
Amount
Primary copper coil rewinding
Secondary copper coil rewinding
Voltage regulator replacement consisting of 15 kg copper
Terminal lead consisting of copper
Regulator switch
New bush changing
Insulation cost 15% of item no.1,2,3,4
Denting and painting
Tools and tackles
Supervisor 1 No. x 2 shift x 10 days
Highly skilled Electrician 1 No. x 2 shift x 10 days
Skilled Electrician Helper 2 Nos. x 2 shift x 10 days
60% scrap value less of (1+2+3+4)
Total impact of GST for the purpose of CTC
M/s. SARSWATI ENTERPRISES, KATHARA (BID ID -1200423)
K K Traders (BID ID -1200816)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_360429.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.50 MB
BOQ
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .