Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC 57 VILLAGE ATAULA PANIPAT 132113 | PANIPAT | PANIPAT | HARYANA | 132113 | L1 | Accepted-AOC Lowest Rate | |
| 2 | L2₹9.0 L+₹45,971.59 (5.38%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹9.4 L+₹89,855.80 (10.5%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹9.6 L+₹1.0 L (11.9%)Rejected-Finance | L4 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | THE OM LC SOCIETY ATAWALA L1 | THE SHIV SHAKTI CO-OP L/C SOCIETY LTD. L4 | The Panwar Co-Operative Labour & Construction Society Ltd. Kithana L3 | The Guru Kirpa Co Operative Labour and Construction Society Ltd Assandh L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | the analysis of the earth filling supply of earth filling transport include loading and unloading the lead of transport of per km rate is 5 rs in portal the rate is not sepate per km the analysis is based on hsr number 4.33 and 3.1.2 and the per km 5 rs above 5km to 15 km the total rate may be calculate combine the hsr items 4.33 and 3.1.2 and add per km rate as per hsr 3.1.2 total rate calculate the 206 rs per cum | 546 | cum | 200 ₹1,09,200 Lowest | 260 ₹1,41,960 | 250 ₹1,36,500 | 216 ₹1,17,936 |
Tender Value
₹8.6 L
EMD Value
₹17,144
Closing Date
16 Jul 2025, 11:00 amClosed
ASHOK KUMAR
Municipal Committee Assandh
Const of street nali from bye pass to ho rajesh rozra ( salwan halwai wali gali)(chabbera colony) in ward no 16 Assandh (Only for L and C Society Ltd)
2025_HRY_457249_1
20259D4C15F3 2F10 456C BD53 A9364640CD8F313ULB
Open Tender
Civil Works
Works
200 days
Assandh
2 documents required · 2 mandatory
₹1,000
Yes
₹17,144
Yes
9 Aug 2025
9 Jul 2025
16 Jul 2025
9 Jul 2025
16 Jul 2025
9 Jul 2025
9 Jul 2025 - 11 Jul 2025
Amount
the analysis of the earth filling supply of earth filling transport include loading and unloading the lead of transport of per km rate is 5 rs in portal the rate is not sepate per km the analysis is based on hsr number 4.33 and 3.1.2 and the per km 5 rs above 5km to 15 km the total rate may be calculate combine the hsr items 4.33 and 3.1.2 and add per km rate as per hsr 3.1.2 total rate calculate the 206 rs per cum
Bidder Name
Amount
THE OM LC SOCIETY ATAWALA (GSTN-NA) BID ID -1297055
THE SHIV SHAKTI CO-OP L/C SOCIETY LTD. (GSTN-NA) BID ID -1296947
The Panwar Co-Operative Labour & Construction Society Ltd. Kithana (GSTN-NA) BID ID -1296984
The Guru Kirpa Co Operative Labour and Construction Society Ltd Assandh (GSTN-NA) BID ID -1297189
The Guru Kirpa Co Operative Labour and Construction Society Ltd Assandh (BID ID -1297189)
The Panwar Co-Operative Labour & Construction Society Ltd. Kithana (BID ID -1296984)
THE SHIV SHAKTI CO-OP L/C SOCIETY LTD. (BID ID -1296947)
The Guru Kirpa Co Operative Labour and Construction Society Ltd Assandh (BID ID -1297189)
The Panwar Co-Operative Labour & Construction Society Ltd. Kithana (BID ID -1296984)
THE SHIV SHAKTI CO-OP L/C SOCIETY LTD. (BID ID -1296947)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .