| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 CrRejected-AOC | ₹2.3 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹2.4 CrRejected-AOC KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹2.4 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹2.6 CrRejected-AOC | ₹2.6 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹2.6 CrRejected-AOC FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.6 Cr | L5 | Rejected-AOC L5 |
Tender Value
₹3.5 Cr
EMD Value
₹6.9 L
Closing Date
19 Dec 2025, 10:00 amClosed
S.E.
E.G.C.C. Circle, Bijnor
Reconstruction of tail fall at km. 10.000 and Redesign of Internal Cross Section from km. 0.000 to km. 10.200 of Nagina Branch Cum Escape, year 2025-26
2025_UPIDC_1098106_1
04/SE/2025-26
Open Tender
Civil Works - Canal
365 days
Bijnor
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.9 L
10 Feb 2026
12 Dec 2025
19 Dec 2025
12 Dec 2025
19 Dec 2025
12 Dec 2025
Dismantling C.C work including stacking of material within 60 meter lead.
Earthwork in excavation in ordinary soil including lift upto1.50M & lead upto 30 M & including Back filling, Watering, Ramming of excavated earth, T&P etc. complete.
Ordinary Centering & shuttering of Plywood or steel for RCC Work
Laying C.C- 1:3:6 (M-10), with cement, course sand and crushed Stone ballast 4mm to 20 & 20 mm to 40 mm (Graded). size mortar in foundation including cost of all material, labour,T&P etc.
Laying C.C- 1:1.5:3 (M-20), using size 4-10 mm & 10-20mm graded crushed aggregate including all cost of material, labour , T&P & Mechanical Mixing etc. for completion of work.
Laying C.C 1:1:2 (M-25), using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P & Mechanical Mixing etc. for completion of work.
Supply & Laying of Reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.
P/Laying Brick Ballast Including cost of all material, labour, T&P etc. for completion of work
Brick work in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum)
Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM)
Supplying and Laying Boulders (20 to 40 Kg. Weight) i/c Cost of all Material, Labour and T&P, all lift and lead etc for proper completion of work.
Supplying and Placing graded Filter in Layers i/c Cost of all Material, Labour and T&P, all lift and lead etc for proper completion of work.
P/Fixing of 100 mm. Dia. PVC Pipe in R.C.C. including cost of all material, labour , T&P etc. for completion of work per Rm.
Finishing wall with two coat of water proof cement paint Weather coat of approved quality on new surface with this paint to give an even shade including supply of all marerials, labour, Tools & plant etc. required for proper completion of the work.
Earth work in filling in all type of soil for strengthning of banks and rain cuts with all lift & lead up to 600 m. with all dressing ramming proper compaction upto required level & slope i/c cost of earth all taxes, labour, T&P etc. complete.
Earthwork in excavation in ordinary soil including lift upto 2.8 M & lead upto 30 M & including Back filling, Watering, Ramming of excavated earth, T&P etc. complete. (from km 0.00 to km 10.200 )
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
Tendernotice_2.pdf
PDF • 0.94 MB
BOQ_2022240.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid