Tender Value
₹11.7 Cr
EMD Value
₹23.3 L
Closing Date
1 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
AS PER NIT AND TENDER DOCUMENT
AS PER NIT AND TENDER DOCUMENT
construction of 08 Courts on 4th and 5th floor and 2 courts building at3rd floor of court complex bharatpur
2026_CEPWD_569945_1
Nit No 05/2026-27 ACE PWD ZONE BHARATPUR
Open Tender
Civil Works
420 days
AS PER NIT AND TENDER DOCUMENT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
AS PER NIT AND TENDER DOCUMENT
₹23.3 L
Yes
ACE PWD ZONE BHARATPUR
20 Jun 2026
20 Jun 2026
2 Jul 2026
20 Jun 2026
1 Jul 2026
20 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips, valleys and rafters etc. and stacking the within 50 meter lead of:G.I. Sheet. | 83 | sqm | 48 | ₹3,984 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. | 14 | cum | 637 | ₹8,918 |
| 3 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Columns, pillars, posts and struts etc. | 3,200 | sqm | 375 | ₹12,00,000 |
| 4 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix / Design Mix Add extra for providing richer mixes respectively at all floor levelsProviding M-25 grade concrete by using cement as per codal provision instead of M-20 grade design mix. | 433 | cum | 5,678 | ₹24,58,574 |
| 5 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 4 (1 cement : 4 coarse sand) | 2,377.62 | cum | 5,196 | ₹1,23,54,113.52 |
| 6 | Half brick masonry in Superstructure , above plinth level upto floor V level using bricks of designation 75 Cement mortar 1 : 4 (1 cement : 4 coarse sand)Add extra providing and placing in position 2 Nos. ,6mm Ø M.S. bar at every third course of half brick masonry . | 3,052.18 | sqm | 617 | ₹18,83,195.06 |
| 7 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement for Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.
M20 grade Nominal Mix / Design Mix | 1,720 | Cum | 5,185 | ₹89,18,200 |
| 8 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 16,000 | sqm | 340 | ₹54,40,000 |
| 9 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)Thermo-mechanically Treated bars (Conforming of relevent IS code) | 3,38,021 | Kg | 77 | ₹2,60,27,617 |
| 10 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish :20mm thick . | 18,534.9 | sqm | 202 | ₹37,44,049.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.62 MB
Tendernotice_2.pdf
PDF • 9.82 MB
BOQ_1014190.xls
BOQ • 0.44 MB
Financial.pdf
Tender Documents • 4.80 MB
rate_analysis_CourtallPROTECT.pdf
Tender Documents • 0.35 MB
PostQualification.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid