Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC | ₹5.1 Cr Quoted ₹5.4 Cr | L1 | Accepted-AOC lowest tenderer |
| 2 | L2₹5.5 Cr+₹10.3 L (1.90%)Rejected-Finance T V RENGANATHA PURAM ROAD PAPPAMMAL PURAM AUNDIPATTI THENI 625512 | AUNDIPATTI | THENI | TAMIL NADU | 625512 | ₹5.5 Cr+₹10.3 L (1.90%) | L2 | Rejected-Finance Higher than
lowest |
| 3 | L2₹5.5 Cr+₹10.3 L (1.90%)Rejected-Finance 11 RAMASAMY COLONY NORTH THALLAKULAM MADURAI 625002 | MADURAI | TAMIL NADU | 625002 | ₹5.5 Cr+₹10.3 L (1.90%) | L2 | Rejected-Finance Higher than
lowest |
Tender Value
₹5.1 Cr
EMD Value
₹2.7 L
Closing Date
15 Jul 2020, 1:30 pmClosed
Superintending Engineer-H-CandM Circle Villupuram
Office of the Superintending Engineer-H-C and M- Circle Ellis Chatram Road-Vazhudareddy-Villupuram
Widening- Strengthening- Improvements to Riding Quality- Bridge and Culvert including upkeeping for a period of 60 Months in Sankarapuram-H-C and M Subdivision Jurisdiction Package 75
2020_HWAY_167018_1
TN.7/2020-21/HDO/Dt.29.05.2020
Open Tender
Civil Works - Highways
Percentage
210 days
Kallakurichi
pls refer PQ Document Vol-I
8 documents required · 8 mandatory
₹0
₹2.7 L
23 Oct 2020
5 Jun 2020
17 Jul 2020
6 Jun 2020
15 Jul 2020
19 Jun 2020
11 Jun 2020 - 16 Jun 2020
eProcurement System Government of Tamil Nadu Created By: Kesavan M Created Date/Time: 04-Aug-2020 04:31 PM Tender Title: Package-75-CRIDP-2020-21 Tender ID: 2020_HWAY_167018_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Villupuram Circle
Widening, Strengthening, Improvements to Riding Quality, Bridge and Culvert including upkeeping for a period of 60 Months in Sankarapuram (H) C&M Subdivision Jurisdiction (Package 75) A-Widening from Intermediate lane to Two lane and Strengthening of Vellimalai Moolakadu Pudhur road at km 57/6 - 59/6 including Reconstruction of narrow culverts at Km 57/10, 58/4, 58/8 & 59/4 including upkeeping for a period of 60 months. (MD 809) B-Widening from Intermediate lane to Two lane and Strengthening of Vellimalai Moolakadu Pudhur road at km 59/6 - 60/8 including Widening of narrow bridge at Km 60/8(MD 809) including upkeeping for a period of 60 months C-Widening from Intermediate lane to Two lane and Strengthening of Vellimalai Moolakadu Pudhur road at km 60/8 - 62/8 including Reconstruction of narrow culverts at Km 61/10 & 62/2 (MD 809) including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 0/0 - 1/2 of Road branching at km 1/4 of Odiyandal Eduthanur road to Chinnakolliyur including upkeeping for a period of 60 months E-Improvements to Riding Quality at km 0/0 - 0/810 of Porasapattu Erudayampattu Road to Mettukkuppam Suthamalai road including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 VELMANI CONSTRUCTION 45779432.040 5.000 53836612.000 Five Crore Thirty Eight Lakh Thirty Six Thousand Six Hundred and Tweleve
2.00 TTK Construction 45779432.040 7.000 54862071.000 Five Crore Fourty Eight Lakh Sixty Two Thousand Seventy One
3.00 S VELUCHAMY 45779432.040 7.000 54862071.000 Five Crore Fourty Eight Lakh Sixty Two Thousand Seventy One
Lowest Amount Quoted BY: VELMANI CONSTRUCTION(53836612.000)
BOQ Summary Details Tender Title: Package-75-CRIDP-2020-21 Tender ID: 2020_HWAY_167018_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 VELMANI CONSTRUCTION 53836612.000 L1
2 TTK Construction 54862071.000 L2
3 S VELUCHAMY 54862071.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .