| Sl No | Description | Qty | Unit | PSSC INFRA PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00 | Survey , Planning , Design, drawing, supply, constructing, testing, commissioning and satisfactory trials of MPS (main pumping station) at existing 3.5 MLD STP Mela maidan Pushkar, Rising Main from Existing STP Mela Maidan Pushkar to 2.0 MLD Advance STP, construction of 2.0 MLD Advance STP with Guaranteed Outlet Parameters, Artificial Reservoir, Solar power plant , Construction of Guest House , Construction of Boundary wall and Entry gate , Internal Road and Pathway and development of Infrastructure for Eco-Tourism site using different Irrigation Technologies like Micro, Drip, Mini Sprinkler Irrigation along with landscaping work including all Civil, Electrical & Mechanical, automation,Architectural complete as per Scope of Work & Technical Specification in the tender based on Engineering procurement and construction(E.P.C.) single Responsibility turnkey basis .
(Sum of Amount Calculated in Schedule 1 to 8) | 1 | Job | 43,50,00,000 ₹43.5 Cr |
| 2.00 | Operation & Maintenance Cost for 08 Years for all the components mentioned in this BoQ and all the assets to be created under this contract, Bidder has to quote the Operation & Maintenance Cost for 08 Years.
(Sum of Amount Calculated in Schedule 9) | 1 | Job | 4,88,00,000 ₹4.9 Cr |
Updated dates
Tender Value
₹44.1 Cr
EMD Value
₹88.2 L
Closing Date
20 Jan 2026, 3:00 pmClosed
ACE WR Zone Jaipur
O/o Additional Chief Engineer Water Resources Zone, Sinchai Bhawan JLN Marg Jaipur
Construction of Water Storage Structure and Anicut to transfer treated water to nearby area of Savitri Mata Temple Pushkar District Ajmer with O and M of 8 years based on EPC-Single Responsibility Turnkey Basis
2025_WRDAS_520038_1
ACE NIT 34/2025-26_Savitri Mata
Open Tender
Civil Works
730 days
Under jurisdiction of WR Division Ajmer II
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
a
₹88.2 L
Yes
Jaipur
23 Feb 2026
12 Dec 2025
21 Jan 2026
12 Dec 2025
20 Jan 2026
12 Dec 2025
24 Dec 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Additional Chief Engineer , Water Resources Zone-Jaipur , Rajasthan
Name of Work: “Construction of Water Storage Structure and Anicut to transfer treated water to nearby area of Savitri Mata Temple Pushkar District Ajmer (with O&M of 8 Years based on EPC single Responsibility Turnkey Basis)"
Contract No: ACE NIT No.: 34/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder (including GST) Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT (including GST) TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Survey , Planning , Design, drawing, supply, constructing, testing, commissioning and satisfactory trials of MPS (main pumping station) at existing 3.5 MLD STP Mela maidan Pushkar, Rising Main from Existing STP Mela Maidan Pushkar to 2.0 MLD Advance STP, construction of 2.0 MLD Advance STP with Guaranteed Outlet Parameters, Artificial Reservoir, Solar power plant , Construction of Guest House , Construction of Boundary wall and Entry gate , Internal Road and Pathway and development of Infrastructure for Eco-Tourism site using different Irrigation Technologies like Micro, Drip, Mini Sprinkler Irrigation along with landscaping work including all Civil, Electrical & Mechanical, automation,Architectural complete as per Scope of Work & Technical Specification in the tender based on Engineering procurement and construction(E.P.C.) single Responsibility turnkey basis . (Sum of Amount Calculated in Schedule 1 to 8) itemH1Code1 1 Job 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 Operation & Maintenance Cost for 08 Years for all the components mentioned in this BoQ and all the assets to be created under this contract, Bidder has to quote the Operation & Maintenance Cost for 08 Years. (Sum of Amount Calculated in Schedule 9) code1.02 1 Job 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BidSavitrimata.pdf
Tender Documents • 9.18 MB
BOQ_927551.xls
BOQ • 0.34 MB
Priceschedule.pdf
Other Document • 0.60 MB
Download all tender documents and submit your bid