| 1 | 1₹79.9 LAccepted-AOC | 1 | Accepted-AOC 1st Lowest | |
| 2 | 2₹87.5 L+₹7.6 L (9.52%)Rejected-Finance | 2 | Rejected-Finance 2nd lowest | |
| 3 | 3₹88.8 L+₹8.9 L (11.1%)Rejected-Finance A 5 KAUSHALPURI COLONY KHARGAPUR GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | 3 | Rejected-Finance 3rd lowest | |
| 4 | 4₹94.7 L+₹14.8 L (18.5%)Rejected-Finance | 4 | Rejected-Finance 4th lowest | |
| 5 | 5₹96.6 L+₹16.7 L (20.9%)Rejected-Finance VILLAGE POST PANCHKURA MAHAN HAMIRPUR | HAMIRPUR | HAMIRPUR | UTTAR PRADESH | 5 | Rejected-Finance 5th lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
6 Jun 2025, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
CONSTRUCTION OF BOUNDARY WALL NEAR SAI AQUADUCT IN DISTRICT RAEBARELI
2025_UPIDC_1044617_1
02/SE-XII/2025-26
Open Tender
Civil Works
Fixed-rate
120 days
RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,992
₹2.2 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
5 Aug 2025
31 May 2025
6 Jun 2025
31 May 2025
6 Jun 2025
31 May 2025
3 Jun 2025
Amount
Providing driving and installing drive drive cast-in-situ reinforced cement concrete pile of grade M-25 of specified diameter and length bellow the pile cap , to carry safe working load not less than specified , excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. for 300mm dia 1.50 mtr pile
Centering and Shuttering for RCC Work including rent of shuttering and all cost of material, labour and T&P etc. complete for the proper completion of work.
Providing and laying R.C.C work 1:1.5:3 (cement: coarse sand : stone ballast of 20 mm nominal size ) including manual mixing with all cost material, labour and T&P excluding centering, shutering and reinforcement etc. required for the proper completion of work.
Class M 150 brick work in 1:4 (cement: coarse sand) including cost of all material, labour and T&P etc. complete for the proper completion of work.
Plastering of 12 mm thick over brickwork and concrete work in 1:4 (cement: coarse sand) including all cost of material ,labour and T&P etc. complete for the proper compleation of work.
Providing and laying of reinforcement required for R.C.C. work with cutting, bending, binding including all cost of material ,labour and T&P etc. complete for the proper compleation of work.
Painting of finishing walls with smooth Exterior paint of required even shade including of all materials and T & P etc. completed (.apex Ultima, Weather Coat all gauard, Asian, berger etc.)
Providing and fencing barbed iron wire between two post fitted and fixed with G.I. staples, turn buckles etc. complete including all cost of material, labour, T&P etc. required for proper completion of work.
Providing and fixing angle iron post 50x50x6 mm placed every 3 mtr center to center embedded in concrete in depth of 0.45 m and every corner , end and every 15th post shall be strutted on both side including cutting , drilling holes, riveting/welding as necessary with one coat of red oxide primer and its carriage upto site including cost of all material, labour, T&P etc. required for proper completion of work.
Providing and fixing 1 big 1 small of gate of specified shape, size and design welded in built up section / framed work. Including cutting , hosting, fixing in position and applying a primer coat of approved steel primer using structural steel etc. required for proper completion of work.
Earthwork in excavation by Hydraulic/manual means over areas (exceeding 30cm in depth ,1.5 m in which as well as 10 sqm on plan )including getting out and disposal of excavated earth lead up to 50 m and for all lift , as per directed by Engineer -in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 Cement : 5 coarse sand (zone-III) : 10 graded stone aggregate 40 mm nominal size delivered from natural sources
Class M 150 brick work in 1:4 (cement: coarse sand) including cost of all material, labour and T&P etc. complete for the proper compleation of work.
Providing and laying of R.C.C. in 1:1.5:3 (cement: coarse sand : stone ballast of 20 mm nominal size )with all the cost of material labour and T&P etc. complete for the proper compleation of work.
Structural steel work in single section fixed with or without Connecting plate including cutting hosting fixing in position and applying a primming coat of approved steel primer all complete for the proper compleation of work.
Supplying installation, testing & commissioning of Grid Interactive rooftop Solar photo voltaic Power generation System including apce frame(2KW) With Brickwork structure with R.C.C coulumn size 300x300 mm @ 3.00 mtr center & RCC Plinth beam size 300x300mm at ground level and coping
Cleaning thick jungle and thorney bushes without uprooting
Earthwork in restoration of outer bank slope with Local earth incluuding all lead, lift, manual compaction dressing, labour T & P required for proper completion of work
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 Cement : 5 coarse sand (zone-III) : 10 graded stone aggregate 40 mm nominal size delivered from natural sources
Class M 150 brick work in 1:4 (cement: coarse sand) including cost of all material, labour and T&P etc. complete for the proper compleation of work.
Plastering of 12 mm thick over brickwork and concrete work in 1:4 (cement: coarse sand) including all cost of material ,labour and T&P etc. complete for the proper compleation of work.
Painting two coat high quality Enamel paint of approved shade with priming after scraping of old steel surface to remove dirt etc of Grill with specified brushing including all cost of material, labour, T&P, etc complete. Two or more coats on new work over and under coat of suitable shade with ordinary paint of approved brand and manufacture
Painting of finishing shoulder walls with Smooth Exterior Paint of Required even Shade including of all materials and T&P etc completed.( apex Ultima,Weather Coat all guard asian,berger)
M/S Kamlesh Kumar Singh (BID ID -5237497)
HARI OM ENTERPRISES (BID ID -5236939)
M/S KAPOOR TRADERS (BID ID -5236407)
JAY SHREE ENTERPRISES (BID ID -5238518)
M/S CHAUDHARY ENTERPRISES (BID ID -5234723)
ASHUTOSH KUMAR VERMA (BID ID -5237362)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .