Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹1.1 Cr+₹26,538.99 (0.25%)Rejected-Finance GERUA PO BARKHOPA PS TAMULPUR DIST BAKSA ASSAM PIN 781367 | BAKSA | ASSAM | 781367 | ₹1.1 Cr+₹26,538.99 (0.25%) | L2 | Rejected-Finance Refer to Financial minutes. |
| 3 | L3₹1.1 Cr+₹42,460.99 (0.40%)Rejected-Finance | ₹1.1 Cr+₹42,460.99 (0.40%) | L3 | Rejected-Finance Refer to Financial minutes. |
| Sl No | Description | Qty | Unit | MD. FAIZUDDIN AHMED L2 | NAHEED HUSSAIN SAIKIA L3 | BRAHMAPUTRA ENGINEERS L1 |
|---|---|---|---|---|---|---|
| 1.00A.Thanguri Dong Water Harvesting Project | ||||||
| 1.01 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, samplings and trees etc. | 0.12 | Ha | 55,808.98 ₹6,697.08 Lowest | 55,808.98 ₹6,697.08 Lowest | 55,808.98 ₹6,697.08 Lowest |
| 1.02 | Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307 | 112.5 | Cum | 192.78 ₹21,687.75 Lowest | 192.78 ₹21,687.75 Lowest | 192.78 ₹21,687.75 Lowest |
| 1.03 | Excavation for Structures (Earth work in excavation of foundation of structures (i)Above GBL | 235.75 | Cum | 145.18 ₹34,226.19 Lowest | 145.18 ₹34,226.19 Lowest | 145.18 ₹34,226.19 Lowest |
| 1.04 | Excavation for Structures (Earth work in excavation of foundation of structures (ii)Bellow GBL | 40.38 | Cum | 159.46 ₹6,438.99 Lowest | 159.46 ₹6,438.99 Lowest | 159.46 ₹6,438.99 Lowest |
| 1.05 | Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40 mm normal size mechanically mixed, placed in foundation and compacted by vibration | 4.93 | Cum | 6,357.1 ₹31,340.5 Lowest | 6,357.1 ₹31,340.5 Lowest | 6,357.1 ₹31,340.5 Lowest |
| 1.06 | Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, curing | 41.96 | Cum | 7,877.8 ₹3,30,552.49 Lowest | 7,877.8 ₹3,30,552.49 Lowest | 7,877.8 ₹3,30,552.49 Lowest |
| 1.07 | Supplying, fitting & placing TMT bar reinforcement in substructure | 2.52 | Ton | 67,525.36 ₹1,70,028.86 Lowest | 67,525.36 ₹1,70,028.86 Lowest | 67,525.36 ₹1,70,028.86 Lowest |
| 1.08 | Plastering with cement mortar ( 1 : 3 ) on R.C.C. works | 181.87 | Sqm. | 152.32 ₹27,702.44 Lowest | 152.32 ₹27,702.44 Lowest | 152.32 ₹27,702.44 Lowest |
| 1.09 | Construction of embankment with approved material obtained fromborrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a leadupto 1000 m as per Technical Specification Clause 301.5 | 1,206.04 | Cum | 271.92 ₹3,27,946.94 Lowest | 271.92 ₹3,27,946.94 Lowest | 271.92 ₹3,27,946.94 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
24 Mar 2026, 1:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Mitigation of Flash Flood and Landslides by Application of Mechanical and Biological Measures at Bhelamari village under SDMF
2026_SCD_51899_1
Tender/NIT/Pt-II/2025-26/8711
Open Tender
Civil Works
Item Rate
180 days
Baksa Soil Conservation Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,125
₹2.1 L
Yes
4 Jul 2026
12 Mar 2026
25 Mar 2026
13 Mar 2026
24 Mar 2026
16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A.Thanguri Dong Water Harvesting Project | |||||
| 1.01 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, samplings and trees etc. | - | Ha | 55,808.98 | - |
| 1.02 | Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307 | - | Cum | 192.78 | - |
| 1.03 | Excavation for Structures (Earth work in excavation of foundation of structures (i)Above GBL | - | Cum | 145.18 | - |
| 1.04 | Excavation for Structures (Earth work in excavation of foundation of structures (ii)Bellow GBL | - | Cum | 159.46 | - |
| 1.05 | Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40 mm normal size mechanically mixed, placed in foundation and compacted by vibration | 1 | Cum | 6,357.1 | ₹6,350.74 |
| 1.06 | Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork, curing | - | Cum | 7,877.8 | - |
| 1.07 | Supplying, fitting & placing TMT bar reinforcement in substructure | 1 | Ton | 67,525.36 | ₹67,457.83 |
| 1.08 | Plastering with cement mortar ( 1 : 3 ) on R.C.C. works | - | Sqm. | 152.32 | - |
| 1.09 | Construction of embankment with approved material obtained fromborrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a leadupto 1000 m as per Technical Specification Clause 301.5 | 0.8 | Cum | 271.92 | ₹217.26 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BaksaSMDFBid.pdf
Tender Documents • 1.02 MB
BOQ_82246.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .