| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹19.3 LAWARDED | ₹19.3 L | AWARDED |
Tender Value
₹18.3 L
EMD Value
₹45,850
Closing Date
19 Aug 2025, 10:30 pmClosed
Mangalore Electricity Supply Company Limited
Repair and Re-conditioning of failed 1x5MVA Power Transformer (TCC Pvt. Ltd. make) of 33/11KV Parkala sub-station of Manipal Sub-division, Udupi Division.
MESCOM/2025-26/EL/WORK_INDENT333
MESCOM/2025-26/EL/WORK_INDENT333
Open
Electrical
Two Tender Document System(Two Cover)
MESCOM Superintending Engineer Circle Office Udupi
₹500
₹45,850
6 Aug 2025
6 Aug 2025
20 Aug 2025
11 Aug 2025
Material Portion
Providing new transil oil to Power Transformer 10% of the Weight of oil - 3000kgs = 300 i.e due to wastage of oil during handling
Providing new winding in place of damaged winding including cost of materials and drying etc. Damaged winding to be retained by the repairer (refer BOQ for more details)
Providing solid insulation materials for replacement of damaged or burnt insulation as per actual weight for all the 3 limbs
Providing new CRGO lamination to the core in place of damaged lamination wherever necessary taking into account of released CRGO which has to be retained by the repairer (refer BOQ for more details)
Loading of faulty power transformer main tank with active parts, with oil and loading of Transformer accessories (refer BOQ for more details)
Transportation of faulty power transformer main tank with oil along with accessories from 33/11kV Parkala Sub-station to repairer's premises (refer BOQ for more details) - Upto 250 km (charges are sub...
Transportation of faulty power transformer main tank with oil along with accessories from 33/11kV Parkala Sub-station to repairer's premises (refer BOQ for more details) - Greater than 250 km (charges...
Unloading of the faulty power transformer tank with active parts and accessories at repairer's worksite.
Draining out oil from the Power Transformer complete duly collecting the oil in barrels (supplied by MESCOM) and shifting barrels to safe place with proper tightness of lid to avoid moisture
Dismantling faulty transformer for joint inspection at repairer's premises including all activities such as opening of top cover, de-tanking of core and winding, separation of HV/LV coils, conducting ...
Re-assembly of Core and winding with new solid insulation.
Cleaning, repairing and painting inside the transformer tank with hot oil bath and acid proof epoxy paint and painting outside the tank with enamel paint after thorough cleaning including the cost of ...
Drying out the assembly of core and winding in oven/vacuum chamber, till the specified insulation resistance values are obtained as per IS (including cost of material and labour).
Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant IS, putting back the cover, tightening the fixtures, fixing the bushing etc, brazing of l...
Reconditioning of accessories such as radiators by hot air circulation,Conservator, Marshalling Box, WTI, OTI and repairs to other accessories wherever necessary.
Filling of oil to the main tank and OLTC tank filtering the oil including filtering till attainment of prescribed BDV valves including labour, filtering equipment along with accessories. The minimum B...
Loading of repaired good transformer tank with active parts and accessories at repairer's premises
Transportation of faulty power transformer main tank with oil along with accessories from repairer's premises to destination Sub-Station of MESCOM (refer BOQ for more details) - Upto 250 km (charge...
Transportation of faulty power transformer main tank with oil along with accessories from repairer's premises to destination Sub-Station of MESCOM (refer BOQ for more details) - Greater than 250 km ...
Unloading and assembly of the repaired power transformer tank with active parts and all accessories at the destination station of MESCOM
Labour for providing new winding in place of damaged winding
Labour for providing solid insulation materials for replacement of all the 3 limbs
Labour for providing new CRGO lamination to the core in place of damaged lamination wherever necessary
Transit Risk insurance- Two Way (to & Fro) (refer BOQ for more details)
Testing Portion
Testing the transformer for routine tests as per IS 2026-1983 in presence of MESCOM Staff at repairer's premises (refer BOQ for more details)
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .