Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹77.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹83.3 L+₹6.0 L (7.72%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹83.6 L+₹6.2 L (8.06%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹85.6 L+₹8.2 L (10.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
3 Oct 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Restoration and Preservation of Ragneya Mata Asthapan Temple Raythan Khansahib Budgam
2026_PWDJK_325712_1
NIT_No_94_DB_2027-26
Open Tender
Civil Works
Percentage
90 days
Khansahib
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,600
Executive Engineer RnB Division Budgam
₹2.4 L
8 Oct 2026
22 Sept 2026
3 Oct 2026
22 Sept 2026
3 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 1.01 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 353.5 | cum | 187.3 | ₹66,210.55 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 83.85 | cum | 218.4 | ₹18,312.84 |
| 3 | Providing and laying of GSB using nallah material for filling , including dressing of surface to required levels and grades. The work includes collection, carriage, and stacking of Nallah GSB from approved sources, spreading in layers not exceeding 225 mm in loose thickness, watering, and compacting with vibratory roller or any suitable means to achieve required compaction and level. The finished surface shall be firm and properly set for further construction activities. The rate includes mechanical lead upto 15km and head load upto 50mtrs. complete work in all respects as per the directions of the Engineer-in-Charge. | 77.29 | cum | 850 | ₹65,696.5 |
| 4 | P/L of stone soling incl. ramming,hand packing and all carriages, complete job in geocell,trenches,foundation etc. | 57.51 | cum | 1,000 | ₹57,510 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Mud mat | 67.46 | cum | 5,202.9 | ₹3,50,987.63 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 81.35 | cum | 7,788.4 | ₹6,33,586.34 |
| 7 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Quarry | 15.27 | cum | 5,536.55 | ₹84,543.12 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 37.82 | cum | 6,591.25 | ₹2,49,281.08 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 10.46 | cum | 7,104.35 | ₹74,311.5 |
stage.html
html • 0.02 MB
finance_1101149.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1101149.xls
BOQ • 4.61 MB
Corrigendum.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .