| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 CrAccepted-AOC | ₹26.7 Cr Quoted ₹26.9 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹28.0 CrRejected-AOC | ₹28.0 Cr | L2 | Rejected-AOC NOT BEING LOWEST |
| 3 | L3₹30.8 CrRejected-AOC | ₹30.8 Cr | L3 | Rejected-AOC NOT BEING LOWEST |
| 4 | L4₹31.6 CrRejected-AOC | ₹31.6 Cr | L4 | Rejected-AOC NOT BEING LOWEST |
| 5 | L5₹31.9 CrRejected-AOC | ₹31.9 Cr | L5 | Rejected-AOC NOT BEING LOWEST |
Tender Value
₹29.4 Cr
EMD Value
₹15 L
Closing Date
30 Mar 2024, 6:00 pmClosed
Chief Engineer Chennai Zone
HQ CE CHENNAI ZONE ISLAND GROUNDS ANNA SALAI CHENNAI 600009
ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) FOR PROVISION OF CERTAIN TECHINCAL INFRACSTRUCTURES FOR FACULTY OF ELECTRONICS (FEL) MCEME AT SECUNDERABAD
2024_MES_641609_1
89075/E8
Open Tender
Civil Works
730 days
MCEME SECUNDERABAD
Please refer tender notice and tender documents
8 documents required · 8 mandatory
₹3,000
Yes
GE MCEME Secunderabad
₹15 L
Yes
HQ Chief Engineer Chennai Zone
21 May 2024
12 Feb 2024
2 Apr 2024
12 Feb 2024
30 Mar 2024
18 Mar 2024
22 Feb 2024
Amount
ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) FOR PROVISION OF CERTAIN TECHINCAL INFRACSTRUCTURES FOR FACULTY OF ELECTRONICS (FEL) MCEME AT SECUNDERABAD comprising of Site clearance/Area Development, Buildings and structures incl Internal water supply and Internal electric supply, Roads, Paths, Culverts, Sewage Disposal, Area Drainage, Fencing & Gates, Rain water harvesting, Arboriculture, External Electric & water supply, Borewell, Solar Power plant, Cooling appliances & Air conditioning, Fire alarm & Fire fighting system, Building Lightning protection System , EOT Crane, Lift , Standby power supply (DG set), Demolition, Schedule of Credit, GRIHA 3 star rating, walk through, 3D model etc. all as stipulated in scope of work and other documents of the tender, complete, all as specified and as directed.
MANNING & OPERATION OF LIFT (REFER Annexure-XXI to Scope of work)
(MANNING AND OPERATION OF LIFT DURING DEFECTS LIABILITY PERIOD) Notes for Items No.2.02 to 2.05 below:- (i) The Maning and operation of Goods lift 1500 Kg by lift operator shall commence immediately after completion of entire work under Milestone - 3 (ii) Lift operator must have at least three years practical experience in lift erection and maintenance work or worked for five years as lift operator elsewhere in private sector. During emergencies, such as power failure, when lift is trapped in between floors, the operator must know how to remove the Goods safely out from the lift at nearest floor landing. (iii) One lift operator each must be available at Lift site i.e. Technical training and Education Block - 1 Lift during his eight hours duty time as specified. (iv) No payment will be made if lift operator absent and effective recovery @ Rs.1000/- shall be made for per shift per operator . (v) No escalations applicable to these items and nothing extra shall be payable. (vi) Proper attendance register shall be maintained. (vii) Log Sheet in prescribed format as directed/suggested by Engineer- in- Charge/ GE will have to be arranged and maintained by contractor/firm for which no extra payment paid on this account. (viii) Lift operator must wear proper uniform with name of operator and firm name embroided. It shall be the responsibility of the contractor to provide uniform to operator with out any extra cost. Dress code shall be as approved by GE. (ix) The staff engaged by contractor shall be well behaved and polite. Any misbehaviour by any worker shall be taken up seriously. The concerned labour shall have to be removed immediately by the contractor and alternative arrangement for the same shall be made without any break. (x) Department shall not be responsible for any accident or injury to any labour while on work. It shall be the responsibility of the contractor to watch the welfare of the labour deployed by him. He shall keep a First Aid Box at site with all necessary medicines. (xi) The Contractor shall provide a Mobile phone (Kept at Lift Operator) with incoming & outgoing facility to contact in emergency during any breakdowns etc. (xii) Careful control on the plant and maintain clean and hygenic condition. (xiii) Any tradesman/employees shall not be allowed to continue their employment for more than 11 month.
Manning & Operation of fully automatic electrically operated Goods lift of provided make & type by providing 01 lift attendant (semi skilled) for 01 Shift of 8 Hrs on all days including Sundays and holidays including keeping the lift clean, carrying out routine maintenance, taking care of lift from theft or damage etc. to ensure smooth and trouble free operation of lift during the 02 years of defects liability period of the project, complete all as specified and as directed by the Engr-in-charge for Goods Lift - 01 No of configuration (G+3) at Technical training and Education Block
Manning & Operation of fully automatic electrically operated Goods lift as mentioned for First year during defects liability period after physical completion, testing and taking over of Lift by MES all as specified and as directed. Man power to be employed per day:- Lift Operator - 01 Person One Lift Operator per shift of 8 hours each for 1shift
All as per item No.2.03 above for Remaining period of First year and second year during defects liability period all as specified and as directed. Man power to be employed per day:- Lift Operator - 01 Person One Lift Operator per shift of 8 hours each for 1shift
All as per item No.2.03 above for Remaining period of Second year during defects liability period as specified and as directed. Man power to be employed per day:- Lift Operator - 01 Person One Lift Operator per shift of 8 hours each for 1shift
(MANNING AND OPERATION OF LIFT AFTER DEFECTS LIABILITY PERIOD) (REFER Annexure-XXI to Scope of work) Notes for Items No.2.07 to 2.11:- (i) The outsourcing of operation of Goods lift 1500 Kg by lift operator shall commence immediately after completion of work under Milstone - 7 (ii) Lift operator must have at least three years practical experience in lift erection and maintenance work or worked for five years as lift operator elsewhere in private sector. During emergencies, such as power failure, when lift is trapped in between floors, the operator must know how to remove the Goods safely out from the lift at nearest floor landing. (iii) One lift operator each must be available at Lift site i.e., Technical training and Education Block - 01 Lift during his eight hours duty time as specified. (iv) No payment will be made if lift operator absent and effective recovery @ Rs.1000/- shall be made for per shift per operator . (v) No escalations applicable to these items and nothing extra shall be payable. (vi) Proper attendance register shall be maintained. (vii) Log Sheet in prescribed format as directed/suggested by Engineer- in- Charge/ GE will have to be arranged and maintained by contractor/firm for which no extra payment paid on this account. (viii) Lift opertater must wear proper uniform with name of operator and firm name embroided. It shall be the responsibility of the contractor to provide uniform to operator with out any extra cost. Dress code shall be as approved by GE. (ix) The staff engaged by contractor shall be well behaved and polite. Any misbehaviour by any worker shall be taken up seriously. The concerned labour shall have to be removed immediately by the contractor and alternative arrangement for the same shall be made without any break. (x) Department shall not be responsible for any accident or injury to any labour while on work. It shall be the responsibility of the contractor to watch the welfare of the labour deployed by him. He shall keep a First Aid Box at site with all necessary medicines. (xi) The Contractor shall provide a Mobile phone (Kept at Lift Operator) with incoming & outgoing facility to contact in emergency during any breakdowns etc. (xii) Careful control on the plant and maintain clean and hygienic condition. (xiii) Any tradesman/employees shall not be allowed to continue their employment for more than 11 month.
Manning & Operation of fully automatic electrically operated Goods lift of provided make & type by providing 01 lift attendant (semi skilled) for 01 Shift of 8 Hrs on all days including Sundays and holidays including keeping the lift clean, carrying out routine maintenance, taking care of lift from theft or damage etc. to ensure smooth and trouble free operation of lift 03 years after the defects liability period of the project, complete all as specified and as directed by the Engr-in-charge for Goods Lift - 01 No of configuration (G+3) at Technical training and Education Block.
Manning & Operation of fully automatic electrically operated Goods lift as mentioned First year after defects liability period, i.e after completion of 24 months of handing over of Lift by MES all as specified and as directed. Man power to be employed per day:- Lift Operator - 01 Person One Lift Operator per shift of 8 hours each for 1shift
All as per item No.2.08 for Remaining period of First year and second year after defects liability period all as specified and as directed. Man power to be employed per day:- Lift Operator - 01 Person One Lift Operator per shift of 8 hours each for 1shift
All as per item No.2.08 for Remaining period of second year and third year after defects liability period all as specified and as directed. Man power to be employed per day:- Lift Operator - 01 Person One Lift Operator per shift of 8 hours each for 1shift
All as per item No.2.08 for Remaining period of third year after defects liability period all as specified and as directed. Man power to be employed per day:- Lift Operator - 01 Person One Lift Operator per shift of 8 hours each for 1shift
COMPHREHENSIVE MAINTENANCE OF LIFTS (REFER Annexure - XXII to Scope of work.)
(COMPHREHENSIVE MAINTENANCE OF LIFTS AFTER DEFECTS LIABILITY PERIOD) Notes for Items Nos. 3.02 to 3.05 below:- (Refer Notes for Annexure - XXII (ANNUAL COMPHREHENSIVE MAINTENANCE OF LIFTS) to Scope of work on Srl Page Nos. 110 & 111 here-in-before)
Comprehensive maintenance of Electrically Operated Goods lift - 01 No of configuration (G+3) in Technical Training & Education Block including ARD and all connected components of lift during First year after completion of Defect liability period all as specified and as directed.
Comprehensive maintenance of Electrically Operated Goods lift - 01 No of configuration (G+3) in Technical Training & Education Block including ARD and all connected components of lift during balance of First year and Second year after completion of Defect liability period all as specified and as directed.
Comprehensive maintenance of Electrically Operated Goods lift - 01 No of configuration (G+3) in Technical Training & Education Block including ARD and all connected components of lift during balance of Second year and Third year after completion of Defect liability period all as specified and as directed.
Comprehensive maintenance of Electrically Operated Goods lift - 01 No of configuration (G+3) in Technical Training & Education Block including ARD and all connected components of lift during balance of Third year after completion of Defect liability period all as specified and as directed.
Sri Raghava Constructions Ltd
Sukhdevraj Sharma Engineers & Contractors Pvt Ltd
CH.VEERARAGHAVULU CONSTRUCTION PVT LTD
N R Constructions
SVS PROJECTS
GOPAL TEKNOCON PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid