| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.0 LAccepted-AOC | L1 | Accepted-AOC Being a lowest bidder and reasonable rate quoted | |
| 2 | L2₹38.1 L+₹5,360 (0.14%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹40.2 L+₹2.2 L (5.78%)Rejected-Finance BHAVANI KRUPA GANDHI CHOWK PULGAON 442302 | WARDHA | MAHARASHTRA | 442302 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹42.1 L+₹4.1 L (10.7%)Rejected-Finance | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹42.3 L+₹4.3 L (11.4%)Rejected-Finance BHAWANI KRUPA GANDHI CHOWK PULGAON | PULGAON | WARDHA | MAHARASHTRA | L5 | Rejected-Finance Other than lowest bidder |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
4 May 2021, 6:00 pmClosed
GE PULGAON
GE Pulgaon CAD Camp Pulgaon PIN 442303
ESSENTIAL SERVICES AT PUMP HOUSES AND DG SETS UNDER GE PULGAON
2021_MES_436373_1
8883/PUL/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
GE PULGAON
As per Tender document
8 documents required · 8 mandatory
₹500
GE PULGAON
₹96,000
Yes
1 Jun 2021
15 Apr 2021
11 May 2021
15 Apr 2021
4 May 2021
29 Apr 2021
15 Apr 2021 - 27 Apr 2021
Amount
Essential services for maintenance of following electric driven centrifugal pump, Generators, filtration plants, chemical dosing system at Cotton Market Pump House/ Picket Hill installation area including operation of sluice valve round the clock in (three shifts), (i) Shift 0600-1400 Hrs, (ii) 1400-2200 Hrs and (iii) 2200-0600 Hrs during the month including Sunday, holidays by employing two FGM cum operator in 1st shift, two FGM in IInd shift and two FGM in third shift complete all as directed as per availability of water/electric supply during stagered timings of suction and delivery side complete all as directed and specified
Cotton Market Pump House/Picket Hill Installation :-
Centifugal pump set 120 HP, DSM 125/40 Make : Kirloskar-07 Nos
Centrifugal pump set 110 HP, DSM 125/40 Make : Kirloskar-02 Nos
Generating set 200 KVA Make :Kirloskar-02 Nos
Filteration plant - 01 No, Alum dosing plant -01 No,Bleaching dosing plant - 01 No
Chlorine mixing plant - 01 No
UG Sump 1 Lakh GL - 03 Nos
Essential services for filling of the vertical turbine pumping set at Gunjkheda Raw Water Pump house area with DG Set including operation of sluice valve round the clock in (three shifts) (i) Shift 0600-1400 Hrs, (ii) 1400-2200 Hrs and (iii) 2200-0600 Hrs during the month including Sunday, holidays by employing one FGM cum operator in 1st shift, one FGM in IInd shift and one FGM in third shift complete all as directed as per availability of water/electric supply during stagered timings of suction and delivery side complete all as directed and specified comprising of the following :
Gunjkheda Raw water Pump House :-
VT pump set water lubricated type 30 HP-01 Nos
VT pump set Oil lubricated water lubricated type 40 HP-01 No
VT pump set water lubricated type 60 HP-02 Nos
Submersible pump 30 HP-01 No
Diesel Generating set 82.5 KVA, -02 Nos (Mahindra -01No and Kirloskar green-01No)
Jack well -02 Nos
Essential services for maintenance of electric driven pump with DG Set at MAP Pump House area (Residential area) including operation of sluice valve round the clock in (Two shifts) (i) Shift 0600-1400 Hrs (ii) 1400-2200 Hrs during the month including Sunday, holidays by employing one FGM cum operator in 1st shift, One FGM in IInd shift complete all as directed as per availability of water/electric supply during stagered timings of suction and delivery side complete all as directed and specified comprising of the following :
Map Pump House With DG Set :-
Centrifugal pump set 7.5 HP, Make : Kirloskar-02 No
UG Sump 10 thousand GL -01 No
Essential services for maintenance of electric driven pump, 29 GP Pump House area (Perimeter area) including operation of sluice valve round the clock in (Two shifts) (i) Shift 0600-1400 Hrs (ii) 1400-2200 Hrs during the month including Sunday, holidays by employing one FGM cum operator in 1st shift, One FGM in IInd shift complete all as directed as per availability of water/electric supply during stagered timings of suction and delivery side complete all as directed and specified comprising of the following :
29 GP Pump House :-
Centrifugal pump set 7.5 HP, Make : Kirloskar-02 No
UG Sump 10 thousand GL -01 No
Essential services for operation of sluice valve round the clock at IT chowk, depot gate and near EP Barrack in (three shifts)(i) Shift 0600-1400 Hrs, (ii) 1400-2200 Hrs and (iii) 2200-0600 Hrs during the month including Sunday, holidays by employing one FGM cum operator in 1st shift, one FGM in IInd shift and one FGM in third shift complete all as directed as per availability of water/electric supply during stagered timings of suction and delivery side complete all as directed and specified comprising of the following :
FOR F Sub Depot Pump House AND DEPOT AREA :-
Sluice Valve 300 MM dia -01 No (For FSD Pump House)
Sluice Valve 200 MM dia -02 No (Depot Area)
Sluice Valve 200 MM dia -01 No (For Raw water)
Note :- for item No 1 ,2, 3, 4 ,5 ,6 & 7 As per terms and condition : The operation shall only be done by trained and licensed skilled FGM having ITI qualified or equivalent, with one year practical experience or min 10+2 qualification with five year experience of similar work
Every tradesman should have his own valid identity card for being Indian Citizen.
Police verification should invariably get done for each tradesman.
Qualification/experience certificate of the employed tradesmen shall be kept on record.
Minimum wages as per Minimum Wages Act shall be paid.
Charter of duty for each tradesman shauld be given including for maintaining cleanliness of work place/area/installations/plant & machineries.
The wages paid record be maintained at GE office, being the principal employer of the tradesmen employed by the contractor.
All records as required as per SOP on EM installation for the upkeep of installations shall be maintained.
Tradesmen should wear proper uniform and name plate/badge.
Tradesmen employed shall not be continues to work beyound 11 months.
Tradesmen shall be rotated in such a way with suitable break in service during the period employed, to avoaid claim legal right for permanency at a later date.
Service/job outsourced should not be of permanent nature.
All service contained in various labour laws/Acts and IAFW-21249 as amended from time to time are meticulously followed.
Contractor provided water supply tools, electrician tools, safety tools and emergency torch.
All tradesmen shall be individually life insured. The insurance certificate should be kept on record.
Contractor responsible for opening and depositing of PPF A/C of each personel deployed.
Contractor will implement of labour payment through e-payment system.
M/s Prakash Agencies
M/s Dara Constructions, Pulgaon
SHRI RANI SATI TRADERS
M/S JAI BHAWANI CONSTRUCTIONS
Bidder Name
SHRI RANI SATI TRADERS
SHREE SIDDHIVINAYAK TRADERS
M/s Dara Constructions, Pulgaon
M/s Prakash Agencies
M/S JAI BHAWANI CONSTRUCTIONS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .