Loading…
Loading…
Tender Value
₹93.4 L
EMD Value
₹1.9 L
Closing Date
3 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
WORKS
16 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As detailed in Para 10.2 of Tender Form (Second sheet) of Part 1 of attached GCC-2022.
The tenderer shall submit certificates regarding status of firm i.e. sole proprietorship, partnership, Company, Society/Trust etc. and should submit supporting documents e.g. notarized affidavit, MOA/AOA, Certificate of Incorporation, Partnership deed, power of attorney etc. (as applicable) to comply Para no. 10, 14, 15, 16 & 18 of Tender Form (Second Sheet) of Part I of attached GCC-2022.
The contractor should have a valid Electrical contractor license issued by Govt. and submit along with tender documents. If tenderer fails to submit a valid electrical contractor license, then offer from the tenderer will be summarily rejected.
13 conditions
Tender document and all the uploaded supporting documents must be digitally signed by the authorized signatory for tender, in token of their acceptance.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
OHE work in c/w proposed PF raising (PF-1, 2) of HDA, DHND, KKU, DNK, BDYK station & PF extension (PF-1, 2) at KKU station in JP-FL Section, PF raising (PF-1, 2) of BAI, BSKO, KNDL station & PF raising (PF-2) of PKBS station of Jaipur Division.
GSU-EL-TRD-JP-2026-27-01R~NWR
GSU-EL-TRD-JP-2026-27-01R
Open
Works - General
9 Months
Jaipur, Rajasthan
₹0
₹1.9 L
3 Jul 2026
9 Jun 2026
19 Jun 2026
81 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 93,41,839.11 | ||
| — | 2.00 | — | — | ||
| Preparation of design and drawing for Overhead Equipment and verification and modification in plan Inspection by : Consignee Inspection charges : None | — | — | — | 40,593.82 | |
| — | 10.00 | — | — | ||
| Supply of danger / caution boards Supply of caution boards, unwired turnout boards, engine stop boards, sigma boards etc. and other all similar type of boards. Inspection by : Consignee Inspection charges : None | — | — | — | 18,427 | |
| — | 10.00 | — | — | ||
| Erection of danger / caution boards Supply of caution boards, unwired turnout boards, engine stop boards, sigma boards etc. and other all similar type of boards. Inspection by : Consignee Inspection charges : None | — | — | — | 2,063.5 | |
| — | 12.00 | — | — | ||
| Supply of Retro Reflective number plates Inspection by : Consignee Inspection charges : None | — | — | — | 16,924.32 | |
| — | 12.00 | — | — | ||
| Erection of Retro Reflective number plates Inspection by : Consignee Inspection charges : None | — | — | — | 900.36 | |
| — | 149.00 | — | — | ||
| Concrete for foundation and plinth in all type of soil incl. hard soil and rock Inspection by : Consignee Inspection charges : None | — | — | — | 12,50,919.07 | |
| — | 30.00 | — | — | ||
| Supply of rolled or fabricated and galvanized steel for traction mast, TTC, Portals (boom & uprights), AT masts, feeder mast, super-masts, bridge masts, steel gantries, supporting structures, Drop arm, SPS etc. Inspection by: RITES, Inspection charges: Borne by Railway | — | — | — | 40,54,667.7 | |
| — | 30.00 | — | — | ||
| Erection, testing & commissioning of rolled or fabricated and galvanized steel for traction mast, TTC, Portals (boom & uprights), AT masts, feeder mast, super-masts, bridge masts, steel gantries, supporting structures, Drop arm, SPS etc. Inspection by: Consignee. Inspection charges: None | — | — | — | 3,13,481.4 | |
| — | 2.00 | — | — | ||
| Supply of material for complete Guy rod assembly as per latest RDSO drg., spec & explanatory notes Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 23,820 | |
| — | 2.00 | — | — | ||
| Erection, testing & commissioning of material for complete Guy rod assembly as per latest RDSO drg., spec & explanatory notes Inspection by : Consignee Inspection charges : None | — | — | — | 3,516.98 | |
| — | 41.00 | — | — | ||
| Supply of material for complete Single bracket assembly including ST, BT Insulators as per latest RDSO drg., spec & explanatory notes Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 13,30,074.85 | |
| — | 41.00 | — | — | ||
| Erection, testing & commissioning of material for complete Single bracket assembly including ST, BT Insulators as per latest RDSO drg., spec & explanatory notes Inspection by : Consignee Inspection charges : None | — | — | — | 99,410.24 | |
| — | 1.00 | — | — | ||
| Supply of material for complete regulated equipment (3 pulley type) with counter weight assembly for Regulated tension as per latest RDSO drg., spec & explanatory notes Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 82,649.15 | |
| — | 1.00 | — | — | ||
| Erection, testing & commissioning of material for complete regulated equipment (3 pulley type) with counter weight assembly for Regulated tension as per latest RDSO drg., spec & explanatory notes Inspection by : Consignee Inspection charges : None | — | — | — | 6,869.48 | |
| — | 1.00 | — | — | ||
| Supply of material for complete termination of Single/Double conductor of overhead equipment with 9-ton insulators as per latest RDSO drg., spec & explanatory notes Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 19,379.08 | |
| — | 1.00 | — | — | ||
| Erection, testing & commissioning of material for complete termination of Single/Double conductor of overhead equipment with 9-ton insulators as per latest RDSO drg., spec & explanatory notes Inspection by : Consignee Inspection charges : None | — | — | — | 2,801.32 | |
| — | 145.00 | — | — | ||
| Supply of material of Structure bonds as per latest RDSO drg., spec & explanatory notes Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 1,52,603.8 | |
| — | 145.00 | — | — | ||
| Erection, testing & commissioning of material of Structure bonds as per latest RDSO drg., spec & explanatory notes Inspection by : Consignee Inspection charges : None | — | — | — | 51,941.9 | |
| — | 4.00 | — | — | ||
| Supplyg of material for single earth electrode as per latest RDSO drg., spec, explanatory notes & earthing -bonding code. Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 14,836.08 | |
| — | 4.00 | — | — | ||
| Erection, testing & commissioning of material for single earth electrode as per latest RDSO drg., spec, explanatory notes & earthing -bonding code. Inspection by : Consignee Inspection charges : None | — | — | — | 6,777.76 | |
| — | 160.00 | — | — | ||
| Supply of material for 50 mm x 6 mm MS Flat earth Bus as per latest RDSO drg., spec, explanatory notes & earthing -bonding code. Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 39,947.2 | |
| — | 160.00 | — | — | ||
| Erection, testing & commissioning of material for 50 mm x 6 mm MS Flat earth Bus as per latest RDSO drg., spec, explanatory notes & earthing -bonding code. Inspection by : Consignee Inspection charges : None | — | — | — | 13,420.8 | |
| — | 1.00 | — | — | ||
| Supply of material for complete anti-creep with galvanized steel wire including cut-in insulators and complete termination as per latest RDSO drg., spec & explanatory notes. Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 49,179.35 | |
| — | 1.00 | — | — | ||
| Erection, testing & commissioning of material for complete anti-creep with galvanized steel wire including cut-in insulators and complete termination as per latest RDSO drg., spec & explanatory notes. Inspection by : Consignee Inspection charges : None | — | — | — | 4,093.62 | |
| Each Span | 30.00 | — | — | ||
| Supply of material for New dropper and re-adjustment of dropper Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 1,14,200.4 | |
| Each Span | 30.00 | — | — | ||
| Erection, testing & commissioning of material for New dropper and re-adjustment of dropper Inspection by : Consignee Inspection charges : None | — | — | — | 14,280.9 | |
| — | 5.00 | — | — | ||
| Erection, testing & commissioning of material complete for solid core cut in insulator Inspection by : Consignee Inspection charges : None | — | — | — | 4,861.55 | |
| — | 2.00 | — | — | ||
| Erection, testing & commissioning of material complete for suspension insulator. Inspection by: Consignee, Inspection charges: None | — | — | — | 1,400.6 | |
| — | 2.00 | — | — | ||
| Supply of material complete for 25kVA 25 kV/240V LT Supply Transformer as per RDSO Spec No - ETI/PSI/15 (08/03) or latest complete with accessories as per latest RDSO drg., spec & explanatory notes Inspection by: Consignee/RITES based on PO value. Inspection Charges: Borne by Railway for RITES & None for Consignee. | — | — | — | 4,73,322.04 | |
| — | 2.00 | — | — | ||
| Erection, testing & commissioning of material complete for 25kVA 25 kV/240V LT Supply Transformer as per RDSO Spec No - ETI/PSI/15 (08/03) or latest complete with accessories as per latest RDSO drg., spec & explanatory notes. Inspection by: Consignee, Inspection charges: None | — | — | — | 24,779.52 | |
| — | 1.00 | — | — | ||
| Dismantling of existing complete anti-creep assemblies with anti-creep wire, insulators, adjusters etc, and transportation to TRD depot. Inspection by: Consignee, Inspection charges: None | — | — | — | 2,013.63 | |
| — | 41.00 | — | — | ||
| Dismantling of existing cantilever assembly. Inspection by: Consignee Inspection charges: None | — | — | — | 62,014.96 | |
| — | 1.00 | — | — | ||
| Dismantling of ATD (regulating equipment) with counter weights. Inspection by: Consignee, Inspection charges: None | — | — | — | 8,335.76 | |
| — | 2.00 | — | — | ||
| Dismantling of guy rod with termination. Inspection by: Consignee, Inspection charges: None | — | — | — | 2,662.92 | |
| — | 2.00 | — | — | ||
| Dismantling of Auxiliary transformer with DO fuse and other components (excluding AT mast) Inspection by: Consignee, Inspection charges: None | — | — | — | 9,163.06 | |
| — | 16.50 | — | — | ||
| Dismantling of Portal, fabricated steel other than Mast/Upright. Inspection by: Consignee, Inspection charges: None | — | — | — | 1,43,452.49 | |
| — | 12.00 | — | — | ||
| Dismantling of Mast / Upright by gas cutting. Inspection by: Consignee, Inspection charges: None | — | — | — | 15,292.56 | |
| — | 19.00 | — | — | ||
| Transportation charges for OHE material. Inspection by: Consignee, Inspection charges: None | — | — | — | 1,34,766.43 | |
| — | 12.00 | — | — | ||
| Breaking of Foundation. Inspection by: Consignee Inspection charges: None | — | — | — | 38,342.04 | |
| for details. | Breakup | — | — | ||
| Power Block Charges - As per Annexure-A | — | — | — | 6,93,651.47 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .