| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-Finance HNO 365 STREET NO 12 TALAB TILLO JAMMU RISHI TRADING CO TALAB TILLO ROAD OPP FRIENDS LANE JAMMU JAMMU KASHMIR 180002 | JAMMU | JAMMU AND KASHMIR | 180002 | L1 | Accepted-Finance 1st Lowest Bidder | |
| 2 | L2₹12.8 L+₹2.6 L (25.5%)Rejected-Finance JHANGA HATA HATA KHAS KUSHINAGAR UTTAR PRADESH | KUSHINAGAR | UTTAR PRADESH | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹13.0 L+₹2.8 L (27.4%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest Bidder | |
| 4 | L4₹13.1 L+₹3.0 L (29.2%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest Bidder |
Tender Value
₹12.8 L
EMD Value
₹15,000
Closing Date
18 Mar 2020, 6:00 pmClosed
SE, ETC, Gorakhpur
Office of SE, ETC, UPPTCL, 132KV S/S Mohaddipur Old, Gorakhpur
SUPPLY , INSTALLATION OF 2 TON / 1.5 TON CAPACITY SPLIT AIR CONDITIONER ALONG WITH FALSE CEILING , UNDER THE DECK INSULATION ALUMINIUM DOOR AND OTHER ASSOCIATED WORKS AT 132 KV S/S F.C.I. UNDER ETD-I , GORAKHPUR
2020_UPTCL_430859_1
E-Tender No. 125-ETC(G)/2019-20
Open Tender
Electrical Works
Item Rate
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
SE, ETC, Gorakhpur
₹15,000
8 May 2020
3 Feb 2020
19 Mar 2020
3 Feb 2020
18 Mar 2020
3 Feb 2020
Amount
Supply and installation of 2 Ton Split AC Hitachi / Daikin / Voltas with 05 KVA Stablizer of V Guard make including supply of all materials , labours and T&P etc. required for completion of work .
Supply and installation of 1.5 Ton Split AC Hitachi / Daikin with 04 KVA Stablizer of V Guard make including supply of all materials , labours and T&P etc. required for completion of work .
Supply and installation of false ceiling of size 2'x2' acustic board in white color , suitable size Aluminium frame for resting pad , hanger , fixing grooves , screws etc. required for completion of work.
Supply and installation setting right of Aluminium Door with glass of size 4"x7" with all accessories and hydraulic machine , hinges etc. along with all cost of men , material and T&P etc. Required for work .
Supply and installation of under the deck insulation to avoid cooling loss from heat of roof with expended polysterene by drilling of roof with all cost of men , T&P and materials etc. required for work.
Providing and Fixing of Door closer to all doors with all cost of men , materials , T&P etc. required for the work.
Dismantling of 2'x2' 36 watt LED Lamp fitting as mounted at top ceiling after Isolator of supply and its again remounting at false ceiling with all cost of men , PVC conduit copper wire for wiring ceiling rose etc. required for work .
Supply installation of electrical control panel suitable for carrying 11 Nos. Split type Air Conditioning system with main switch (150 Amp.) Fuses, MCCBs of 6x16 Amp. , indication lamp suitable size wire , Lugs etc. required for work.
Shambhavi Enterprises
CLIMATISEUR
K M India Pvt Ltd
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .