Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹49.7 L+₹78,217.77 (1.60%)Rejected-Finance HOUSE NO 254P SECTOR 6 ROHTAK OPPOSITE RAJIV GANDHI STADIUM VPO MAKRUALI KALAN 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹54.2 L+₹5.3 L (10.8%)Rejected-Finance H NO 861 12 SALARA MOHALLA ROHTAK 124001 HARYANA INDIA | ROHTAK | HARYANA | 124001 | L3 | Rejected-Finance Not Lowest | |
| 4 | Not Admitted-Fee/PreQual/Technical SHOP NO 320 FIRST FLOOR NEW GRAIN MARET 132024 | KARNAL | HARYANA | 132024 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Vijender Kumar Contractor L3 | MAA KALI BUILDERS PVT.LTD L1 | ANIL KUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | NS Item -S/E of 45 watt LED street light fitting make (Philips/ Bajaj/ Crompton/ Wipro/Surya / Havells / Helonix) aluminium die cast body powder coated, potted driver, toughened glass body luminaries including all labour and patty material to required to complete the job in all respect. | 4 | Each | 24,700 ₹98,800 | 24,500 ₹98,000 Lowest | 24,650 ₹98,600 |
| 2.00 | NS Item -Supply of 20 Watt LED Tube Light Fitting (Philips/ Bajaj/Wipro/Surya/Hevells/Helonix) Complete all respect. | 20 | Each | 209 ₹4,180 | 205 ₹4,100 Lowest | 207 ₹4,140 |
| 3.00 | NS Item -Supply of cable complete with necessary connections 16 sqmm 4 core armaured cable Complete. | 149 | Per Metre | 50 ₹7,450 Lowest | 50 ₹7,450 Lowest | 52 ₹7,748 |
| 4.00 | NS Item -S/E of 1.5 ton split AC (Voltas/ Blue star/ Lloyed) including cost of M.S. stand , Stablizer,and 9 ft copper pipe and all other patty material required to complete the job in all respect. | 1 | Each | 48,300 ₹48,300 | 48,000 ₹48,000 Lowest | 48,100 ₹48,100 |
| 5.00 | S/E of Split A.C. 2.0 Ton 5 star (Lloyed/ Voltas/ Blue Star/Diakin) make including making necessery connections and all patty material required to complete the job in all respect. | 1 | Each | 49,180 ₹49,180 | 49,000 ₹49,000 Lowest | 49,100 ₹49,100 |
| 6.00 | S/E of R.O. 25 L.P.H.. (Livpure ,Kent,Aquaguard) make including making necessery connections and all patty material required to complete the job in all respect. | 1 | Each | 31,900 ₹31,900 | 31,800 ₹31,800 Lowest | 31,900 ₹31,900 |
| 7.00 | S/E of Water Cooler 40/80 Ltr. (Climatrol,Voltas, Usha ,) make including making necessery connections and all patty material required to complete the job in all respect. | 1 | Each | 34,100 ₹34,100 | 34,000 ₹34,000 Lowest | 35,000 ₹35,000 |
| 8.00 | S/E of copper pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect. | 6.11 | Per Metre | 1,043 ₹6,372.73 | 1,040 ₹6,354.4 Lowest | 1,050 ₹6,415.5 |
| 9.00 | S/E of PVC drain pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect. | 20 | Rmt. | 55 ₹1,100 Lowest | 55 ₹1,100 Lowest | 55 ₹1,100 Lowest |
Tender Value
₹47.5 L
EMD Value
₹1.1 L
Closing Date
19 Sept 2025, 9:00 amClosed
NAVEEN KUMAR DHANKAR
Municipal Corporation Rohtak
Construction of sub health center in sunariya kalan, Rohtak. (Re-call)
2025_HRY_472117_1
20251E2C0D1D CF81 4507 8F4D 21647E8D8791287ULB
Open Tender
Civil Works
Works
180 days
Rohtak
2 documents required · 2 mandatory
₹5,000
₹1.1 L
Yes
28 Oct 2025
13 Sept 2025
19 Sept 2025
13 Sept 2025
19 Sept 2025
13 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .