| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.1 LAccepted-Finance | ₹50.1 L | L1 | Accepted-Finance LOWEST |
| 2 | L2₹51.2 L+₹1.1 L (2.25%)Rejected-Finance | ₹51.2 L+₹1.1 L (2.25%) | L2 | Rejected-Finance HIGH RATE BIDDER |
| 3 | L3₹52.0 L+₹1.9 L (3.87%)Rejected-Finance | ₹52.0 L+₹1.9 L (3.87%) | L3 | Rejected-Finance HIGH RATE BIDDER |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to Bid Capacity not being uploaded according to bid conditions and UDIN not being verified. |
| Sl No | Description | Qty | Unit | M/S RADHIKA CONSTRUCTION COMPANY L1 | M/S V S CONSTRUCTORS L2 | Jagjeevan Prasad Verma L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 1,232.61 | M3 | 77 ₹94,910.97 | 70 ₹86,282.7 Lowest | 70 ₹86,282.7 Lowest |
| 2.00 | Laying C.C 1:2:4 with cement, Hamirpur Coarse sand, 10 to 20 mm Kabrai stone grit with mixing, laying, ramming, curing including cost of all material, labour, T&P etc required for proper completion of work | 62.76 | M3 | 9,500 ₹5,96,220 | 9,000 ₹5,64,840 Lowest | 9,800 ₹6,15,048 |
| 3.00 | Supplying and laying 40 mm brick ballast in filter below stone boulder pitching including all cost of material, labour, T&P etc required for proper completion of work as per direction of Engineer in Charge. | 222.71 | M3 | 2,300 ₹5,12,233 | 2,000 ₹4,45,420 | 1,700 ₹3,78,607 Lowest |
| 4.00 | Making subgrade for boulder pitching work with watering, ramming, preparation of sub-surface including levelling, dressing etc required for proper completion of work. | 554.28 | M2 | 14 ₹7,759.92 Lowest | 15 ₹8,314.2 | 15 ₹8,314.2 |
| 5.00 | First class 150 Brick work in 1:4 C.M with cement & Hamirpur Coarse sand including all cost of material, labour, T&P etc required for proper completion of work | 114.18 | M3 | 6,332 ₹7,22,987.76 Lowest | 7,000 ₹7,99,260 | 6,500 ₹7,42,170 |
| 6.00 | Supplying & laying Mirzapur cut stone boulder 25 kg to 60 kg of size approx. 20cmX20cmX15cm manually placed & closely packed in pitching including preparation of subbase, all cost of material, labour, T&P etc required for proper completion of work | 161.35 | M3 | 4,550 ₹7,34,142.5 | 4,000 ₹6,45,400 Lowest | 4,100 ₹6,61,535 |
| 7.00 | Earth work in filling rain cuts, potholes, ruts, making dowla, ramps etc in all type of soil including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 2,581.25 | M3 | 14.7 ₹37,944.38 Lowest | 70 ₹1,80,687.5 | 70 ₹1,80,687.5 |
| 8.00 | Supplying & laying local sand for preparation of subgrade below brick on edge soling including levelling, dressing, cost of all material, labour, T&P etc required for proper completion of work | 261.67 | M3 | 104 ₹27,213.68 Lowest | 500 ₹1,30,835 | 430 ₹1,12,518.1 |
| 9.00 | Supplying & laying Brick on Edge soling with straight over burnt bricks laid on edge on prepared subgrade according to line, grade and cross section and filling joint with sand and spreading 1 cm thick layer of earth over brick soling, watering as per technical specification including cost of all material, labour, T&P etc required for proper completion of work. | 5,233.35 | M2 | 428 ₹22,39,873.8 | 420 ₹21,98,007 Lowest | 450 ₹23,55,007.5 |
| 10.00 | 12mm thick plaster in 1:4 C.M with cement & Hamirpur Coarse sand including all cost of material, labour, T&P etc required for proper completion of work. | 243.01 | M2 | 140 ₹34,021.4 Lowest | 250 ₹60,752.5 | 250 ₹60,752.5 |
Tender Value
₹61.1 L
EMD Value
₹1.2 L
Closing Date
3 Aug 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Laying B.O.E soling from km 38.616 to 39.400 on Right bank of Rapti Main Canal and protection work in D/s of km 39.400 Escape Head Regulator in District Balrampur.
2026_UPIDC_1167986_14
01/SE-IX/2026-27
Open Tender
Civil Works
Item Rate
90 days
BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,721
₹1.2 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
11 Sept 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 1,232.61 | M3 | 90 | ₹1,10,934.9 |
| 0.0 | Laying C.C 1:2:4 with cement, Hamirpur Coarse sand, 10 to 20 mm Kabrai stone grit with mixing, laying, ramming, curing including cost of all material, labour, T&P etc required for proper completion of work | 62.76 | M3 | 11,596.44 | ₹7,27,792.57 |
| 0.0 | Supplying and laying 40 mm brick ballast in filter below stone boulder pitching including all cost of material, labour, T&P etc required for proper completion of work as per direction of Engineer in Charge. | 222.71 | M3 | 2,442.68 | ₹5,44,009.26 |
| 0.0 | Making subgrade for boulder pitching work with watering, ramming, preparation of sub-surface including levelling, dressing etc required for proper completion of work. | 554.28 | M2 | 20 | ₹11,085.6 |
| 0.0 | First class 150 Brick work in 1:4 C.M with cement & Hamirpur Coarse sand including all cost of material, labour, T&P etc required for proper completion of work | 114.18 | M3 | 7,293.31 | ₹8,32,750.14 |
| 0.0 | Supplying & laying Mirzapur cut stone boulder 25 kg to 60 kg of size approx. 20cmX20cmX15cm manually placed & closely packed in pitching including preparation of subbase, all cost of material, labour, T&P etc required for proper completion of work | 161.35 | M3 | 4,699.64 | ₹7,58,286.91 |
| 0.0 | Earth work in filling rain cuts, potholes, ruts, making dowla, ramps etc in all type of soil including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 2,581.25 | M3 | 75 | ₹1,93,593.75 |
| 0.0 | Supplying & laying local sand for preparation of subgrade below brick on edge soling including levelling, dressing, cost of all material, labour, T&P etc required for proper completion of work | 261.67 | M3 | 1,210.69 | ₹3,16,801.25 |
| 0.0 | Supplying & laying Brick on Edge soling with straight over burnt bricks laid on edge on prepared subgrade according to line, grade and cross section and filling joint with sand and spreading 1 cm thick layer of earth over brick soling, watering as per technical specification including cost of all material, labour, T&P etc required for proper completion of work. | 5,233.35 | M2 | 484.12 | ₹25,33,569.4 |
| 0.0 | 12mm thick plaster in 1:4 C.M with cement & Hamirpur Coarse sand including all cost of material, labour, T&P etc required for proper completion of work. | 243.01 | M2 | 302.65 | ₹73,546.98 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
LOT14.pdf
Tender Documents • 5.19 MB
BOQ_2190691.xls
BOQ • 0.27 MB
BOQ_2190691.xls
PDF • 0.31 MB
DATE.pdf
PDF • 0.26 MB
BOQ14.xls
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .