| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹42.9 L (35.0%)Rejected-AOC | ₹1.7 Cr+₹42.9 L (35.0%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.7 Cr+₹50.2 L (41.0%)Rejected-AOC U P SINGH COLONY KANHAIYAPUR VAJIDPUR DISTRICT JAUNPUR U P | ₹1.7 Cr+₹50.2 L (41.0%) | L3 | Rejected-AOC L3 |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
26 Feb 2019, 11:00 amClosed
SE ICC MAHOBA
Office of the SE ICC, BAJARIYA, MAHOBA
EARTH WORK AND PUCCA WORK OF GAJPATIPUR MINOR FROM KM 0.300 TO 3.100 (LOT-02)
2019_UPIDC_311539_2
12/SE/2018-19
Open Tender
Civil Works
Item Rate
90 days
MAHOBA
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
EE IRRIGATION CONSTRUCTION DIVISION
₹3.5 L
Yes
Office of the SE ICC, BAJARIYA, MAHOBA
27 Mar 2021
18 Feb 2019
26 Feb 2019
18 Feb 2019
26 Feb 2019
18 Feb 2019
20 Feb 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
Earth work excavation in mar kabar kankar mixed soil for making canal section including all lift and disposal of excavated material as per direction by Engineer-in-charge with completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
E/W in filling for making embankment and cutting canal cross section after mechanical compaction including dressing and watering with lead up to 1.00KM., lifts, T&P, etc for proper compaction of job as per direction of Engineer- in-charge including all tax like Income tax, Labour cess etc but excluding G.S.T.
Earth work excavation MKR Kankar mixed soil for abutment & wing wall foundation in all lift lead including disposal earth as per site Engineer direction including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supply & Laying c/sand in foundation including all cost of material ,labour ,T & P etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & Laying c:c (1:3:6) with cement ,c/sand ,stone ballast (25 to 50)mm including all cost of material, labour, T & P etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
RCR stone masonery work with (1 :4) cement , caorse sand including all cost of material ,labour , T&P etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supply & Laying 1000 mm dia R C C hume pipe including all cost of material ,color joint with cement ,jute ,labour etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
Centering & shuttering for C : C work including all cost of material ,labour , T & P etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
providing & Laying C:C with (1:2:4) cement, coarse sand ,stone grite (10 to 20) mm including all cost of material ,labour , T&P etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
providing & Laying C:C with (1:1.5:3) cement , coarse sand, stone grite 6.30 to 10 mm on top of parapet & wearing coat including all cost of material ,labour, T&P etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
struck pointing with 1:2 cement ,coarse sand including all cost of material , labour, T&P etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
20 mm thick cement grouted pitching left & right side of sump including all cost of material labour ,T&P etc.
Providing & fixing wheel guard including cost of labour ,T&P etc required for proper completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
Steel reinforcement for RCC work Including cutting, bending, binding with G I wire and placing in position with cost of steel reinforcement including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying and fixing joint filer bond 20mm including codt of sealing compound ,labour T&P etc, rerquired for proper completion work including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & fixing dainage spout pipe of GI 100 mm dia including cost of labour ,T&P etc required for proper completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
E/W in back filling with all cost of labour ,T&P etc with proper comletion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
M/S MANGLAM ASSOCIATE
M/S Ankur And Brothers
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .