| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.3 LAccepted-AOC UTTAR PRADESH | 1 | Accepted-AOC as per letter | |
| 2 | 2₹15.3 L+₹3,213.04 (0.21%)Rejected-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | 2 | Rejected-Finance as per letter |
Tender Value
₹15.3 L
EMD Value
₹1.6 L
Closing Date
5 Oct 2026, 3:00 pmClosed
Executive Engineer Construction Division-1 PWD Gon
Executive Engineer Construction Division-1 PWD Gonda
Special repair of gonda Uttraula road to dhanuli link road
2026_CEDPW_1191151_2
2586/2A dt 11-09-2026
Open Tender
Civil Works
Fixed-rate
work
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
Yes
₹1.6 L
Yes
16 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting stone aggregates of 22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, screening Type-B to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 101.25 | CUM | 4,450 | ₹4,50,562.5 |
| 2 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 | 1,050 | sqm | 55.8 | ₹58,590 |
| 3 | Providing and applying tack coat with V.G.-10 Bitumen using distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | 24 | - |
| 4 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508. | - | sqm | 244 | - |
| 5 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510 | - | sqm | 90 | - |
| 6 | Construction of un-reinforced, dowel jointed at expansion and construction joit only, plain cement concrete pavement,thikness as per design, over a prepared sub base with 43 grade cement or as per clause 1501.2.2 M30@ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity appropriate weight batcher using approved mix design,laid in approved fixed side formwork(steel channel,laying and fixing of 125 micron thick polythene film,wedges ,steel plate including leweling the form work as per drawing),spreading the concrete with shovels,rakes,compacted using needle,screed and plate vibrators and finished in continious oparation including provision of contraction and expansion, construction joints,applying debonding strips,primer,sealant, dowel bar,near approaches to bridges / culvert and construction joints,admixtures as approved,curing of concrete slabs for 14 days,curing compound(where specified) and water finishing to lines and grades as per drawing and technical specification Clause 1501 | 67.5 | sqm | 8,234 | ₹5,55,795 |
| 7 | E/W in excavation in foundation in ordinary soil including lift 1.50 mtr and lead up to 30 mtr and including filling watering ramming of excavated earth into the trenches or into the space of between the building and side the foundation trench or into the plinth and removal and disposal of surplus earth as per direction by E/I as per S.I. No. 251 | 15.64 | Cum | 125 | ₹1,955 |
| 8 | Providing and laying Cement concrete 1:4:8( 1 cement : 4 fine sand : 8 graded brick aggregate 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. As per SI No. 275 | 1.24 | Cum | 4,300 | ₹5,332 |
| 9 | Supply and laying and 15mm gauge Brick Ballast compacting with fine sand as 1st class beding cradle below the pipe in 15 cm thickness and up to 10 % hight of pipe on either side. | 2.97 | Cum | 1,200 | ₹3,564 |
| 10 | Clas-150 brick work with 1:4 cement and coarse sand in foundation and plinth including supply of all materials labour and T&P etc. Requuired for proper completion of work as per S.I No. 305(b) | 5.52 | Cum | 5,600 | ₹30,912 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_2245991.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .