| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.3 CrAccepted-Finance N A | FARIDABAD | HARYANA | 121004 | ₹13.3 Cr | L-1 | Accepted-Finance Accept |
| 2 | L-2₹13.3 CrRejected-Finance | ₹13.3 Cr | L-2 | Rejected-Finance Reject |
| 3 | L-3₹13.3 CrRejected-Finance | ₹13.3 Cr | L-3 | Rejected-Finance Reject |
| 4 | Rejected-Technical 488 101 KATRA BAZAR INDRANAGAR SITAPUR BRANCH ROAD DALIGANJ LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | M/s Bundelkhand Construction Company L1 | RATAN BUILDERS L2 | M/S SURESH CHANDRA GUPTA L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in trench cutting in proper camber according to required depth for laying garnular sub base including rolling with road roller upto required Density, dressing, cost of labour, T&P and hire charges of machinery etc. complete work as per MORTH Clause 301 (3.16) | 10,603 | cum. | 55 ₹5.8 L | 56 ₹5.9 L | 56 ₹5.9 L |
| 2.00 | Compaction of embankment with approved materials deposited at site from road way cutting and excavation from drain and foundation of other structure graded and compacted to meet requirement of table 300.2. As per MORTH No.-305 | 10,603 | cum. | 62 ₹6.6 L | 63 ₹6.7 L | 63 ₹6.7 L |
| 3.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. As Per Specification No. 305(3.16) | 37,129.65 | cum. | 118 ₹43.8 L | 118.5 ₹44.0 L | 119 ₹44.2 L |
| 4.00 | Construction of granular sub-base by providing close Graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 . | 10,151.8 | cum. | 2,236.55 ₹2.3 Cr | 2,236.8 ₹2.3 Cr | 2,237 ₹2.3 Cr |
| 5.00 | Providing laying, spreading and compacting graded stone aggregate to wet mix macadam specification inlcuding premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with mechanical paver in sub-base/base course on wall prepared surface and compacting with vibratory roller to achieve the desired density. As per MOR&TH specification No. 406 | 6,765 | cum. | 2,633 ₹1.8 Cr | 2,634 ₹1.8 Cr | 2,635 ₹1.8 Cr |
| 6.00 | Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.25 kg. per sqm. on the prepared WMM surface cleaned with mechanical broom. As per MORT&H as per Clause 503 | 33,825 | sqm. | 14.48 ₹4.9 L | 14.48 ₹4.9 L | 14.48 ₹4.9 L |
| 7.00 | Providing and laying Dense Graded Bituminous Macadam with 100-120 tonne per hour capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 Percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grade-I) | 3,213.38 | cum. | 8,434 ₹2.7 Cr | 8,434 ₹2.7 Cr | 8,434 ₹2.7 Cr |
| 8.00 | Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface cleaned with mechenical broom. As per MORT&H as per Clause 503 | 33,825 | sqm. | 11.76 ₹4.0 L | 11.76 ₹4.0 L | 11.76 ₹4.0 L |
| 9.00 | Providing and laying bituminous concrete with 100-120 tonne per hour capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 Percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specificationclause No. 507 complete in all respects (Grade-II) | 1,014.75 | cum. | 10,331 ₹1.0 Cr | 10,331 ₹1.0 Cr | 10,331 ₹1.0 Cr |
| 10.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing As per MORT&H Clause 602 | 1,201.75 | cum. | 7,010 ₹84.2 L | 7,010 ₹84.2 L | 7,010 ₹84.2 L |
Tender Value
₹13.3 Cr
EMD Value
₹26.6 L
Closing Date
28 Apr 2026, 12:00 pmClosed
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
Widening and strengthening work of Km 1 to 8-100- of the road starting from Banda-Naraini SH No-113 to Banda-Bisanda SH NO-133 Crossing NH-35 in Banda district
2026_CEBAN_1137164_1
1716/35C-Banda Circle/2025 Date-07-04-2026
Open Tender
Civil Works
365 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,260
₹26.6 L
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
30 May 2026
15 Apr 2026
28 Apr 2026
15 Apr 2026
28 Apr 2026
15 Apr 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in trench cutting in proper camber according to required depth for laying garnular sub base including rolling with road roller upto required Density, dressing, cost of labour, T&P and hire charges of machinery etc. complete work as per MORTH Clause 301 (3.16) | - | cum. | - | - | BI01010001010000000000000515BI0100001111 |
Compaction of embankment with approved materials deposited at site from road way cutting and excavation from drain and foundation of other structure graded and compacted to meet requirement of table 300.2. As per MORTH No.-305 | - | cum. | - | - | BI01010001010000000000000515BI0100001112 | |
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. As Per Specification No. 305(3.16) | - | cum. | - | - | BI01010001010000000000000515BI0100001113 | |
Construction of granular sub-base by providing close Graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 . | - | cum. | - | - | BI01010001010000000000000515BI0100001114 | |
Providing laying, spreading and compacting graded stone aggregate to wet mix macadam specification inlcuding premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with mechanical paver in sub-base/base course on wall prepared surface and compacting with vibratory roller to achieve the desired density. As per MOR&TH specification No. 406 | - | cum. | - | - | BI01010001010000000000000515BI0100001115 | |
Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.25 kg. per sqm. on the prepared WMM surface cleaned with mechanical broom. As per MORT&H as per Clause 503 | - | sqm. | - | - | BI01010001010000000000000515BI0100001116 | |
Providing and laying Dense Graded Bituminous Macadam with 100-120 tonne per hour capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 Percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Grade-I) | - | cum. | - | - | BI01010001010000000000000515BI0100001117 | |
Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.20 kg. per sqm. on the prepared bituminous surface cleaned with mechenical broom. As per MORT&H as per Clause 503 | - | sqm. | - | - | BI01010001010000000000000515BI0100001118 | |
Providing and laying bituminous concrete with 100-120 tonne per hour capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 Percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specificationclause No. 507 complete in all respects (Grade-II) | - | cum. | - | - | BI01010001010000000000000515BI0100001119 | |
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing As per MORT&H Clause 602 | - | cum. | - | - | BI01010001010000000000000515BI0100001120 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_2123387.xls
BOQ • 0.32 MB
SBDTindwara.pdf
Tender Documents • 1.94 MB
Download all tender documents and submit your bid