| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 CrAccepted-AOC | ₹18.5 Cr | L1 | Accepted-AOC Low Price |
| 2 | L2₹20.2 CrRejected-AOC | ₹20.2 Cr | L2 | Rejected-AOC High Price |
Tender Value
₹19.5 Cr
EMD Value
₹19.5 L
Closing Date
12 Mar 2024, 3:00 pmClosed
Commissioner
Pudukkottai Municipality
Designing, constructing, erection and commissioning,startup and performance trial run for 6Months followed by 10 years of O and M of 10.80 MLD capacity sewage treatment plant (STP) with selected modern technology in PUDUKKOTTAI MUNICIPALITY
2024_MAWS_415697_1
2866/2022/E2
Open Tender
Civil Works
720 days
Pudukkottai
Further Qulifaction
4 documents required · 4 mandatory
₹0
₹19.5 L
Pudukkottai Municipality
4 Apr 2025
31 Jan 2024
12 Mar 2024
31 Jan 2024
12 Mar 2024
31 Jan 2024
2 Feb 2024
Amount
Construction of 10.80 MLD STP using SBR Technology under DBOT Basis..
Construction of Compound wall for 313m length as per drawing
Cumulative Total (Say in lakhs)
Add GST 18%
Description of Work / Item(s)
Amount
Schedule B
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 1
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 2
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 3
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 4
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 5
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 6
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 7
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 8
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 9
Total cost of operation and maintenance of 10.80 MLD STP using SBR Technology under DBOT Basis including manpower, spares, consumables, repair work etc. Year 10
Description of Work / Item(s)
Amount
Schedule C - General Items - Environmental, Social, Health and Safety (ESHS) Cost Schedule
Organize meetings with line departments.
Workshop on E&S safeguards and on-job training as identified.
Use of IEC material and use of media channel to create public awareness on waste management
Consultations with stakeholders regularly
Meetings of GRC
Air quality monitoring
Surface water quality monitoring
Ground water quality monitoring
Soil quality monitoring
Noise quality monitoring
Wind speed and direction
Tree Plantation/ Greenbelt Development at project sites
N.P PATEL & CO
N.P PATEL & CO
N.P PATEL & CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid