| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | ₹17.8 L | L1 | Accepted-AOC Less Tenderer |
| 2 | L2₹18.5 LRejected-AOC | ₹18.5 L | L2 | Rejected-AOC Above Tenderer |
| Sl No | Description | Qty | Unit | DON BOSCO SUSAIRAJ L1 | R SRINIVASAN L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 32.75 | Sqm | 545 ₹17,848.75 | 575 ₹18,831.25 |
| 2.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 54 | Cum | 2,669 ₹1.4 L | 2,800 ₹1.5 L |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 36 | Cum | 5,410 ₹1.9 L | 5,600 ₹2.0 L |
| 4.00 | Plain Cement Concrete 1:1.5:3 (one cement, one and half M.Sand and three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 158 | Cum | 7,260 ₹11.5 L | 7,500 ₹11.8 L |
| 5.00 | Supply and fixing of Bitumen Pad for Expansion Joints including all other labour charges etc complete | 31.4 | Sqm | 230 ₹7,222 | 260 ₹8,164 |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 2,71,986.7 ₹2.7 L | 2,81,663.1 ₹2.8 L |
Tender Value
Refer Docs
EMD Value
₹18,020
Closing Date
4 Dec 2025, 3:00 pmClosed
BDO (BP)
Panchayat Union Office Sriperumbudur
Providing Wearing Coat to Indra Nagar Main Road in Mathur Panchayat in Sriperumbudur Panchayat Union.
2025_RDTN_627423_1
1883/2025/A5 Dt.14.11.2025
Open Tender
Civil Works - Roads
90 days
Sriperumbudur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,020
Yes
23 Dec 2025
28 Nov 2025
4 Dec 2025
28 Nov 2025
4 Dec 2025
28 Nov 2025
Amount
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Plain Cement Concrete 1:1.5:3 (one cement, one and half M.Sand and three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supply and fixing of Bitumen Pad for Expansion Joints including all other labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R SRINIVASAN (BID ID -1526317)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_750129.xls
BOQ • 0.36 MB
SCHEDULE.pdf
Additional Documents • 0.65 MB
Download all tender documents and submit your bid