Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC | ₹5.7 L | 1 | Accepted-AOC Lowest Value Quoted |
| 2 | 2₹5.7 LRejected-Finance | ₹5.7 L | 2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | S VEERAPUTHIRAN L2 | S SARAVANA MURUGAN L1 |
|---|---|---|---|---|---|
| 1.00Construction of Drainage with Soak Pit AD Colony Amman Kovil Street to Sivan kovil Street in Tharuvai Panchayat of Palayamkottai Panchayat Union | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 59.83 | cum | 200 ₹11,966 | 197.6 ₹11,822.41 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 11.01 | cum | 5,285 ₹58,187.85 | 5,281 ₹58,143.81 |
| 4.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 37.49 | cum | 6,040 ₹2.3 L | 6,032 ₹2.3 L |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 178.75 | sqm | 550 ₹98,312.50 | 547.3 ₹97,829.88 |
| 6.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 146.51 | kg | 92 ₹13,478.92 | 91.85 ₹13,456.94 |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | 1.8 | cum | 8,895 ₹16,011 | 8,891.5 ₹16,004.70 |
| 8.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm. | 33.9 | sqm | 285 ₹9,661.50 | 281.6 ₹9,546.24 |
| 9.00 | 75.75.7 -- Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth | 13.16 | cum | 265 ₹3,487.40 | 263.5 ₹3,467.66 |
| 10.00 | 75.75.8 -- Earthwork Excavation in Hard soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - For depth 0.30-0.60m | 8.3 | cum | 265 ₹2,199.50 | 263.5 ₹2,187.05 |
Tender Value
₹6.7 L
EMD Value
₹6,682
Closing Date
17 Dec 2025, 3:00 pmClosed
Commissioner, Panchayat Union, Palayamkottai.
Commissioner, Panchayat Union, Palayamkottai.
Construction of drainage with Soak pit AD Colony Amman Kovil Street to Sivan Kovil street in Tharuvai Panchayat 15th CFC 2025-26
2025_RDTN_631227_5
A2/991/2025
Open Tender
Construction Works
150 days
Commissioner, Panchayat Union, Palayamkottai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,682
9 Jun 2026
12 Dec 2025
17 Dec 2025
12 Dec 2025
17 Dec 2025
12 Dec 2025
Amount
Construction of Drainage with Soak Pit AD Colony Amman Kovil Street to Sivan kovil Street in Tharuvai Panchayat of Palayamkottai Panchayat Union
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
75.75.7 -- Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth
75.75.8 -- Earthwork Excavation in Hard soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - For depth 0.30-0.60m
75.75.9 -- Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - For depth above 0.60m
75.31.2 -- Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
75.31.10 -- Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
75.31.22 -- Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Filling the soak pit with 40mm metal as per specification
Filling the soak pit with 20mm metal as per specification
Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
S VEERAPUTHIRAN (BID ID -1536261)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_754949.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid