Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹59.8 CrAccepted-AOC | ₹59.8 Cr | 1 | Accepted-AOC AGREEMENT DONE AS PER LETTER FROM DIVISION |
| 2 | 2₹67 CrRejected-Finance | ₹67 Cr | 2 | Rejected-Finance BEING L2 |
Tender Value
₹60.4 Cr
EMD Value
₹30.2 L
Closing Date
16 Jun 2023, 5:30 pmClosed
Executive Engineer, Water Resources Div. Shajapur
Executive Engineer, Water Resources Division Shajapur
On Turnkey Basis Construction of Gravity Dam under Kabulpur (Kamardipur) Project, as per detailed scope of work but not limited to that.
2023_WRD_267435_1
981/2022-23/Einc/Etendering/ dt.13-04-2023
Open Tender
Civil Works - Others
1095 days
Shajapur
Please refer Tender documents.
29 documents required · 29 mandatory
₹50,000
₹30.2 L
Bhopal
5 Sept 2023
24 Apr 2023
19 Jun 2023
25 Apr 2023
16 Jun 2023
28 Apr 2023
8 May 2023
Amount
Construction of gravity dam on river Kalisindh of Kabulpur (Kamardipur) Medium Irrigation Project on turn key basis as per detailed scope of work but not limited to that.
Construction of gravity dam on river Kalisindh of Kabulpur (Kamardipur) Medium Irrigation Project on turn key basis as per detailed scope of work but not limited to that.
SHIVJI CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid