Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.8 LAccepted-AOC | ₹12.8 L | 1 | Accepted-AOC Y |
| 2 | 2₹12.8 L+₹428 (0.03%)Rejected-Finance | ₹12.8 L+₹428 (0.03%) | 2 | Rejected-Finance N |
Tender Value
₹12.9 L
EMD Value
₹26,000
Closing Date
23 May 2026, 12:00 pmClosed
EE RED Jhansi
EE RED Jhansi
Ward no 36, Premganj Ditiye Baakhar Pipleshwar Mandir ke pass abam Indranagar Shiv mandir ke pass do mini solar pump ki sthapana ka karya.
2026_REDUP_1148834_20
85/RED/Tender/2025-26 Dated-08.04.2026
Open Tender
Civil Works
Percentage
90 days
Ward no 36, Premganj Ditiye Baakhar Pipleshwar Man
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹26,000
Yes
22 Jul 2026
16 May 2026
23 May 2026
16 May 2026
23 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in moorum mixed soil (in Bundelkhand areas) including lift up to 1.5 mand lead up to 30 m and including filling,watering and ramming of excavated earth into the trenches or into the space between the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direced by Engineer-in-charge a distance of 30 m from the foundation trenches. | - | cum | 185.45 | - |
| 2 | Cement concrete in 1:4:8 with cement, sand and (22.4-53) mm granite stone ballast (crusher broken ) in foundation including supply of the materials, labours and T&P etc required for proper compaction of the work . | - | cum | 4,853.07 | - |
| 3 | R.C.C work with 1:2:4 cement,coarse sand and approved 20 mm gauge granite stone grit including supply of the materials, labours and T&P etc required for proper compaction of the work .SOR 2022 SI.No284 | - | cum | 6,444.46 | - |
| 4 | Mild steel or iron in plain work such as rein forced concrete wrought to required same as necessary including bending for proper completion of the work. | - | Qtl | 7,630.12 | - |
| 5 | M-150 brick work in 1:4 cement and fine sand of 1.25 F.M. morter in foundation and plinth including supply of the materials , labours and T&P etc required for proper compaction of the work. | - | cum | 5,251.07 | - |
| 6 | Cement concrete with 1:2:4 cement,coarse sand and approved 20 mm gauge granite stone grit including supply of the materials, labours and T&P etc required for proper compaction of the work . | - | cum | 5,612.88 | - |
| 7 | 12 mm thick plaster with 1:4 cement, fine sand of 1.25 F.M.mortar including supply of the materials, labours and T&P etc required for proper compaction of the work . | - | Sqm | 254.59 | - |
| 8 | Mild Steel iron work in heavy size such as trusses, builtup gate door frame record rack and roof work. | - | Qtl | 8,360.35 | - |
| 9 | Painting or varnishing on two coat new wood or iron work. including supply of all materials, labours and T&P etc. required for proper completion of the work. Si no.641+642 | - | Sqm | 128.84 | - |
| 10 | S/F of water tank with 5000 Ltr capacity i/c all. | - | Ltr | 7.84 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
sbd85New.pdf
Tender Documents • 1.71 MB
BOQ_2150927.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .