| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹29.5 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹39.4 L+₹10.0 L (33.8%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹39.5 L+₹10.0 L (34.0%)Rejected-Finance MIHINPURWA BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L-3 | Rejected-Finance L-3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹34.3 L
EMD Value
₹35,000
Closing Date
4 Aug 2021, 4:00 pmClosed
SE
132 KV S/S Ghazipur
Diversion of 1.3Km 132KV Ghazipur-Bhadaura SC Transmission line (Loc No.27 to Loc No. 32) Due to infringing in ROW of RVNL under ETD Ghazipur
2021_UPTCL_594376_2
E-tender No. 24 ETC(GZP)/2021-22
Open Tender
Electrical Works
Turn-key
120 days
Ghazipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
EE ETD Ghazipur
₹35,000
2 May 2022
27 Jul 2021
5 Aug 2021
27 Jul 2021
4 Aug 2021
27 Jul 2021
Amount
PART-A(SUPPLY)
Accessories for Tower
Number Plate
Danger Plate
Phase Plate set
Earthing Material
Accessories for Conductor
Vibration Dampers for conductor
M.S. Joint for conductor
Repair Sleeve for conductor
P.A. Armour rod
Accessories for Hardwares & insulators
Single tension fitting
Double tension fitting
132 KN 70KN composite silicon rubber polymer Insulator.
132 KN 120KN composite silicon rubber polymer Insulator.
PART-B (WORK)
Survey & Profilling
Check survey
Cost of excavation of 132 KV tower foundation pits including all earth work, back filling, ramming and leveling etc. including the cost of borrowed earth if required
Cost of Setting of stub including all foundation work but excluding the cost of concreting and excavation for following 132 KV DC tower. (rates foe setting of foundation bolts of gantries shall not be paid extra).
Installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting bending, placing, binding etc.
Cost of concreting with 1:2:4 mix concrete for all types of foundation including cost of cement, sand stone, ballast, dewatering, forming, shorting shutering & curing but excluding cost and installation of reinforcement bars (cost includes all expenses of T&P, labour etc.)
Transportation of tower parts, conductor, earthwire and all associated materials to complete the work, including shifting up to loading point, loading into vehicle at 220KV S/S Ghazipur, Transportation and unloading at site approx 20Km.
Erection of superstructure of all 132 KV DA, DB, DC towers and anchor towers and their extention wherever required including all works above ground level excluding hosting of insulator, hardware and accessories but including fitting of danger plate, number plate, phase plate, and bird guard and fixing & punching of bolt.
Tack welding of all the bolts up to the height one section of the tower or 5 meter from the ground level whichever is higher with three tacks at 1200 separation of minimum 10 mm thickness with10 /12 mm electrode and application of zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of river crossing tower & anchor towers.
Laying, stringing tensioning, clamping jointing etc.complete with ACSR panther conductor including hoisting of insulators. Fitting of all necessary hardwares and accessories i.e. fitting armour rods, vibration dampers etc. on all three pahses of 132 KV DC lines.
Supply & laying of 24 Core OPGW on 132KV Line. The work includes supply of OPGW of 24 core with its all associated accessories & laying including testing, Stringing, Tensioning, Clamping, jointing/splicing etc. and other associated work to complete the job satisfactorily.
Pipe type earthing. (Rates incldes cost of coke & salt excavation, backfilling and other associated work.
De-stringing of conductor, de-hosting of insulator, rolling of dismantled conductor and all associated work of all three conductor.
De-stringing of OPGW, rolling of dismantled OPGW and all associated work.
Dismantling of tower, stacking of tower parts and all associated work.
Transportation of dismantled material including shifting upto loading point, loading into vehicle, transportation & unloading at 220 KV S/S Ghazipur store of approx 20 Km.
MS RK ERACTORS
Star Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .