| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | ₹3.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 LRejected-AOC | ₹3.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S SATHISHKUMAR L1 | B.Vinothkumar L2 |
|---|---|---|---|---|---|
| 1.00CONSRTUCTION OF CC DRAINAGE AT RAJESH NAGAR 2ND MAIN STREET AT PANDIYANELLURE PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRCT | |||||
| 2.00 | Earthwork excavation for foundation in all classes of soil and sub soil to full depth except in hard rock requiring blasting but inclusive of strutting if required for the sides of foundation. | 57.66 | Cum | 263.7 ₹15,204.94 | 263.78 ₹15,209.55 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc. | 6.61 | Cum | 5,658.7 ₹37,404.01 | 5,658.72 ₹37,404.14 |
| 4.00 | Supply and erecting Centering charges inclusive of all material and labour charges etc..,Complete as per standard specification | 126.87 | Sqm | 548 ₹69,524.76 | 548.5 ₹69,588.20 |
| 5.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc. | 16.69 | Cum | 6,404.4 ₹1.1 L | 6,408.43 ₹1.1 L |
| 6.00 | Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour | 21.6 | Sqm | 583 ₹12,592.80 | 583.04 ₹12,593.66 |
| 7.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.19 | Cum | 91,944 ₹17,377.42 | 91,944.7 ₹17,377.55 |
| 8.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 2.43 | Cum | 9,296.83 ₹22,591.30 | 9,298.83 ₹22,596.16 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 50,685.24 ₹50,685.24 | 50,710.67 ₹50,710.67 |
Tender Value
₹3.4 L
EMD Value
₹3,380
Closing Date
27 Feb 2026, 3:00 pmClosed
BDO BP
Panchayat Union Sholinghur
CONSRTUCTION OF CC DRAINAGE AT RAJESH NAGAR 2ND MAIN STREET AT PANDIYANELLURE PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRCT
2026_RDTN_667353_1
A2/1250/2026
Open Tender
Civil Works
180 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹3,380
Yes
6 Mar 2026
26 Feb 2026
27 Feb 2026
26 Feb 2026
27 Feb 2026
26 Feb 2026
CONSRTUCTION OF CC DRAINAGE AT RAJESH NAGAR 2ND MAIN STREET AT PANDIYANELLURE PANCHAYAT IN SHOLINGHUR BLOCK RANIPET DISTRCT
Earthwork excavation for foundation in all classes of soil and sub soil to full depth except in hard rock requiring blasting but inclusive of strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Supply and erecting Centering charges inclusive of all material and labour charges etc..,Complete as per standard specification
Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc.
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_801708.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid