Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Not yet disclosed by govt. Qualified | Qualified MSE, Category: General |
| 2 | Not yet disclosed by govt. Qualified | Qualified |
| 3 | Not yet disclosed by govt. Qualified | Qualified MSE, Category: General |
| 4 | Not yet disclosed by govt. Qualified | Qualified MSE, Category: General |
| 5 | Not yet disclosed by govt. Qualified | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
23 Nov 2023, 8:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGLP RE 64
5450902
GEM/2023/B/4076376
Two Packet Bid
Distal Radius External fixator system with distractor compression unit 02 into 3 point 5 mm and 02
30 days
Jammu And Kashmir; Srinagar
Item wise evaluation
PRODUCT
11 documents required · 11 mandatory
2 yrs
₹3
60%
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Distal Radius External fixator system with distractor compression unit 02 into 3 point 5 mm and 02 into 2mm schanz screws | Calcaneum Anatomical Plate SRINAGAR System Right Or Left | 5 | 30 days |
| Calcaneum anatomical plate system right or left low profile complete construct with with 6 Locking screws Titanium | SRINAGAR | 6 | 30 days |
| Clavicular hook plate LCP complete construct with 03 cortical screws and 02 locking screws left or right side Titanium | SRINAGAR | 10 | 30 days |
| Orthopedic tear resistant gloves different sizes size 7 or 7 point 5 or 8 Ultrathick 0point 33 mm | Cross Linked High Molecular SRINAGAR Weight Sod Hyaluronate | 300 | 30 days |
| Cross Linked High Molecular Weight Sod Hyaluronate for Intra Articular Viscosupplementation 30 to 50 mg in PFS of 2 to 6 ml | SRINAGAR | 30 | 30 days |
| Walking Stick Monopod | SRINAGAR | 90 | 30 days |
| Flexible Open Patella knee brace large | SRINAGAR | 90 | 30 days |
| Universal mini External Stabilization system set complete JESS for CTEV large | SRINAGAR | 5 | 30 days |
| Universal mini External Stabilization system set complete JESS for CTEV medium | SRINAGAR | 5 | 30 days |
| Silicon toe separator | SRINAGAR | 40 | 30 days |
| Medial arch insert | SRINAGAR | 40 | 30 days |
| Metatarsal Pad Silicon or Carbon Copolymer | SRINAGAR | 40 | 30 days |
| Soft sole | SRINAGAR | 120 | 30 days |
| Coccyx cushion hard universal | SRINAGAR | 40 | 30 days |
| Cervical pillow universal | SRINAGAR | 60 | 30 days |
| Dorsolumbar Taylor s spinal brace Sizes S or M or L or XL or XXL | SRINAGAR | 30 | 30 days |
| Hot and cold pack size universal reusable | SRINAGAR | 60 | 30 days |
| Gel exercise ball medium | SRINAGAR | 100 | 30 days |
| Shoulder Abduction Support universal | SRINAGAR | 30 | 30 days |
| Traction weight bag universal capacity upto 12 kg | SRINAGAR | 20 | 30 days |
| Foot drop splints | SRINAGAR | 90 | 30 days |
| Cotton cast padding orthoroll 15 cm into 3 metres | SRINAGAR | 1,500 | 30 days |
| Disposable pre sterilised tubing for Arthropump | SRINAGAR | 60 | 30 days |
| Shoulder Arthroscopy Canulas 8 point 5mm 6 point 5 mm pack of 3 | Unilateral Total Knee Replacement SRINAGAR Drape Set Impermeable | 30 | 30 days |
| Unilateral total knee replacement Drape set Impermeable control plus fabric with triple layer | SRINAGAR | 60 | 30 days |
| Joint irrigation fluid 3 ltr collapsible pack Normal Saline | SRINAGAR | 300 | 30 days |
| Battery operated sterile disposable Pulsatile Lavage System | SRINAGAR | 30 | 30 days |
| Pelvic binder Size L or XL or XXL | SRINAGAR | 30 | 30 days |
| Cortex screw 2 point 7mm into 6mm | SRINAGAR | 6 | 30 days |
| Cortex screw 2 point 7mm into 8mm | SRINAGAR | 6 | 30 days |
| Cortex screw 2 point 7mm into 10mm | SRINAGAR | 6 | 30 days |
| Cortex screw 2 point 7mm into 12mm | SRINAGAR | 6 | 30 days |
| Cortex screw 2 point 7mm into 14mm | SRINAGAR | 6 | 30 days |
| Cortex screw 2 point 7mm into 16mm | SRINAGAR | 6 | 30 days |
| Cortex screw 2 point 7mm into 18mm | SRINAGAR | 6 | 30 days |
| Cortical screws mini fragment 2 point 7 mm Titanium | SRINAGAR | 30 | 30 days |
| Minifragment plate 2 point 7 mm with 6 screws Titanium | SRINAGAR | 30 | 30 days |
| Antibiotic coated Femoral Nail with 4 into locking bolts and 01 end cap Titanium | SRINAGAR | 15 | 30 days |
| Antibiotic coated Tibial Nail with 4 into locking bolts and 01 end cap Titanium | Distal Femoral Nail Left Or SRINAGAR Right Complete Construct | 15 | 30 days |
| Distal femoral nail Left or right complete construct with 02 distal locking bolts 02 proximal locking bolts 01 end cap Titanium | SRINAGAR | 15 | 30 days |
| Patellar support brace | SRINAGAR | 90 | 30 days |
| Malleable splints upper limb disposable | SRINAGAR | 150 | 30 days |
| Malleable splints lower limb disposable | Distal Radius Locking Plate SRINAGAR Variable Angle Complete | 150 | 30 days |
| Distal Radius Locking Plate variable angle complete construct with 6 locking and 3 cortical screws Titanium | SRINAGAR | 30 | 30 days |
| Sterile covers for C arm | Sterile Disposable Shoulder SRINAGAR Arthroscopy Drapes Pack | 300 | 30 days |
| Sterile disposable shoulder arthroscopy drapes pack with Fluid Collection bag with Port | Constrained Condylar Knee SRINAGAR Replacement Prosthesis | 60 | 30 days |
| Constrained Condylar knee replacement prosthesis with stem extensions and augments | Posterior Stabilized Modular SRINAGAR Knee Replacement Prosthesis | 3 | 30 days |
| Posterior stabilized modular knee replacement prosthesis cemented High flexion consisting of 1 | Posterior Stabilized Cemented SRINAGAR Total Knee Replacement | 10 | 30 days |
| Posterior stabilized cemented total knee replacement prosthesis with tibial stem extension | Cemented Modular Bipolar SRINAGAR Hip Prosthesis With Colarless | 3 | 30 days |
| Cemented Modular Bipolar hip prosthesis with colarless polished femoral stem and compatible | SRINAGAR | 15 | 30 days |
| Control Cable with Sleeve Cobalt Chrome | Uncemented Total Hip Replacement SRINAGAR Prosthesis Ceramic | 10 | 30 days |
| Uncemented Total Hip replacement prosthesis Ceramic on XLPE with metaphyseal fitting sleeve | Primary Cemented Total Hip SRINAGAR System Metal On XLPE | 2 | 30 days |
| Primary Cemented Total Hip System Metal on XLPE consisting of 1 Highly polished collarless tapered BOQ Title DGLP RE 64 | SRINAGAR | 10 | 30 days |
Exempted
12 Dec 2023
13 Nov 2023
23 Nov 2023
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_5450902.pdf
GEM_BID
boq_re_64_2023-10-12-09-18-49_5b933fe012c4999ab5aa68ce3a8d6662.pdf
BOQ
boq_item_sample_file_2023-10-12-09-18-49_7bd10ce32d06e2a6a76142893acc01ad.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .