Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical VILLAGE POST KARAHARA AGRA 14 MARUTI ENCLAVE PHASE 2 MARUTI ESTATE BODLA SHAHAGANJ AGRA | AGRA | AGRA | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 1ST FLOOR 5 DURGA MARKET VINAY NAGAR CHORAHA SHAHGANJ ROAD AGRA 3 3 SULAHKUL NAGAR BODLA AGRA | AGRA | AGRA | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
Tender Value
₹60.6 L
EMD Value
₹5.0 L
Closing Date
7 Oct 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Reconstruction work of RCC, box culvert and approach road in place of damaged, narrow and slanted arch culvert located at Km-1 of Bhandai to Nagla Bhandai road in Agra district
2026_CEAGR_1191788_1
4966/14M-AC/2026-27 dated 10-09-2026
Open Tender
Civil Works - Bridges
Percentage
150 days
Agra
Construction work of Minor Bridge
2 documents required · 2 mandatory
₹2,360
₹5.0 L
Yes
Agra
7 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres by mechanical means etc. complete as per SOR Ch. 4 S. No- 4 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 80 | Cum | 235 | ₹18,800 |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.etc. complete as per SOR Ch. 6 S. No- 1 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | - | Cum | 75 | - |
| 3 | Plain Cement Concrete (PCC Grade M15) in Open Foundation complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100 SOR Ch. 6 S. etc. complete as per SOR Ch. 6 No- 5 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 50 | Cum | 5,840 | ₹2,92,000 |
| 4 | Plain Cement Concrete (PCC Grade M20) in sub-structure complete as per Drawing and Technical Specifications. Clause 1500, 1700 & 2100 SOR Ch. 6 S. etc. complete as per SOR Ch. 6 S. No- 11 | 47 | Cum | 6,410 | ₹3,01,270 |
| 5 | Reinforced Cement Concrete (M-25) in sub-structure complete as per Drawing and Technical Specifications Clause 1500, 1700 & 2100. etc. complete as per SOR Ch. 6 S. No- 13 | 110 | Cum | 7,220 | ₹7,94,200 |
| 6 | Reinforced Cement Concrete (M-25) in super-structure complete as per Drawing and Technical Specifications Clause 1500, 1600 & 1700 etc. complete as per SOR Ch. 6 S. No- 16 | 130 | Cum | 7,790 | ₹10,12,700 |
| 7 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in sub structure complete as per Drawing and Technical Specifications.Clause 1600 As per DSR | 24 | MT | 67,220 | ₹16,13,280 |
| 8 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Clause 2702 | 8.7 | Cum | 11,130 | ₹96,831 |
| 9 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical Specifications as per etc. complete as per SOR Ch. 6 S.No. 21(Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 64 | No. | 390 | ₹24,960 |
| 10 | Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.Clause 2605 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 45 | meter | 110 | ₹4,950 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_2248703.xls
BOQ • 0.37 MB
T2BHANDAI.pdf
Tender Documents • 4.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .