CHIEF ENGINEER, KMC
KMC Motijheel
Construction of RCC nala from new petrol pump to jarauli village at jarauli puliya in ward 82 under zone 3
2026_NNKAN_1162979_1
328/AA-2/26-27
Open Tender
Civil Works
180 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,042
₹9.1 L
23 Jun 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of RCC or reinforcment brik work including stacking of material etc all complete work. | - | sqm | 1,200 | - |
| 2 | Dismenteling of brick including stacking of dismentled material etc all complete work. | - | cum | 580 | - |
| 3 | Cleaning of open nala under water or liquid mud and in or under foul position with all T&P including lift upto 1.50m and lead upto 30.00m etc all complete as per directtion by Ei/c | - | cum | 190 | - |
| 4 | Making of banddha etc all work | 1 | bag | 42 | ₹41.88 |
| 5 | Dewateing/ Watering of water by diesel pump icluding hire charges of pump , pump operater , fule,cartage of pump at site including all comp. work(228.00per 8 hrs in a day=1824/day) | - | days | 1,824 | - |
| 6 | Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in a distance of 50 mtr. | - | cum | 269 | - |
| 7 | Providing and Laying Cement concrete (1:4:8, 1cement: 4 fine sand: 8 Brick ballast nominal size 40 mm ) and curing complete, including cost of formwork in foundation and floors. | - | cum | 5,740 | - |
| 8 | Centering and shutring including cost of de- shutring and decentering at all level over height 3.5 m aditional height 1 mtr etc all work | - | sqm | 212 | - |
| 9 | RCC Work with cement concrete 1:1.5:3,1cement :1.5 coarse sand:3 stone Agregateexcluding centring shutring reinforcment etc all completion of work.for raft foundation | 168 | cum | 7,590 | ₹12,75,120 |
| 10 | RCC Work with cement concrete 1:1.5:3,1cement :1.5 coarse sand:3 stone Agregate excluding centring shutring reinforcment etc all completion of work.for wall | - | cum | 8,600 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.10 MB
rccnalaffc2306ULBT2.pdf
Tender Documents • 6.23 MB
BOQ_2180101.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid