Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-AOC ROAD BISTA PATH BIJANBARI DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | ₹4.6 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹4.6 Cr+₹4.6 L (1.01%)Rejected-Finance 3RD MILE SEVOKE ROAD SALUGARA SILIGURI 734001 | JALPAIGURI | WEST BENGAL | 734001 | ₹4.6 Cr+₹4.6 L (1.01%) | L2 | Rejected-Finance Quoted second lowest rate |
| 3 | L3₹4.6 Cr+₹6.9 L (1.51%)Rejected-Finance KALIM PONG KALIM PONG WEST BENGAL | ₹4.6 Cr+₹6.9 L (1.51%) | L3 | Rejected-Finance Quoted highest rate |
Tender Value
₹4.6 Cr
EMD Value
₹9.1 L
Closing Date
26 Mar 2025, 6:55 pmClosed
Executive Engineer, T.E.D.
Office of the Executive Engineer, T.E.D., 6th Mile Naya Busty, Darjeeling - 734222
Construction of C.C. Road from Lower Soreng to NH-10, under R.R. Block, G.T.A.
2025_GTA_823783_1
GTA/EE/TED/NIeT-15 (1st Call)/e-Tender/2024-25
Open Tender
CIVIL WORKS
Percentage
365 days
Rangli Rangliot Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9.1 L
Yes
20 Sept 2026
6 Mar 2025
29 Mar 2025
6 Mar 2025
26 Mar 2025
6 Mar 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CUTTING AND UPROOTING Earthwork in cutting to from section in correct profile inculding remoal of spoils not exceeding initial lead of 50m and initial lift of 1.5m. (iii) In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting) | 1,855.96 | cum | 109.9 | ₹2,03,969.45 |
| 2 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (ii) Ordinary soil | 1,484.76 | cum | 79.9 | ₹1,18,632.32 |
| 3 | Excavation in Hard Rock (blasting prohibited)
Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines,grades and cross sections as per Clause 301 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (Mode of measurement: pre works and post works) | 371.19 | cum | 51.5 | ₹19,116.34 |
| 4 | B. SURFACE FINISH WORKS Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed
dressing complete. (Borrow pit measurement) i) In ordinary soil | 2,726.06 | cum | 89.9 | ₹2,45,073.06 |
| 5 | Cost of stone boulder 150 mm size delivered ans stacked at site. | 1,635.64 | cum | 1,463.85 | ₹23,94,328.69 |
| 6 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 10,904.25 | Sqm | 64 | ₹6,97,872 |
| 7 | Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse gregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & inforcement works. M-25 Grade | 2,180.85 | cum | 7,437.71 | ₹1,62,20,529.85 |
| 8 | Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of
supply of G.I. wire. (With 100mm x 100mm mesh.) t | 21,808.5 | Sqm | 201 | ₹43,83,508.5 |
| 9 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden lanks/ply wood/steel sheet plate with required racing for any kind of plain or reinforced concrete works in all sorts of minor structure cluding culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. b) Where staging is not required. | 1,302 | Sqm | 214 | ₹2,78,628 |
| 10 | PEOTECTIVE STRUCTURE Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . a) Depth upto 3m (iv) Work Without pumping out water and without shoring | 448 | cum | 114 | ₹51,072 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .