Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | -0.50% | ₹4.3 L | L1 | Admitted-Finance |
| 2 | L2₹4.4 LAdmitted-Finance | +1.30% | ₹4.4 L | L2 | Admitted-Finance |
Tender Value
₹4.3 L
EMD Value
₹8,620
Closing Date
5 Mar 2026, 10:00 amClosed
Executive officer
JAITARAN
mali shamshan ghat chabutar width worka
2026_DLB_540908_1
nit/2026/8333
Open Tender
Civil Works
jaitaran
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
E O Municipal board Jaitaran, MDRISL Jaipur
₹8,620
Yes
6 Apr 2026
21 Feb 2026
6 Mar 2026
21 Feb 2026
5 Mar 2026
21 Feb 2026
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:4 (1 cement : 4 coarse sand)
Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand)
Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : One face dressed. Red sand stone
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_964211.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.70 MB
BOQ_964211.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid