Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹21.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹21.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹21.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹21.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹21.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹21.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹21.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹21.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹21.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
1 Aug 2026, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Construction of a road in Mayapuram Deputy Kheda (under Haidarganj Ward II) starting from the house of Santosh Kumar Shukla, passing by the house of Sonu Rawat, and extending to the house of Pankaj.
2026_DOLBU_1172357_1
92(6)/CE/2026-27/01
Open Tender
Civil Works
Item Rate
Lucknow Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,014
Lucknow Municipal Corporation
₹2.6 L
1 Aug 2026
25 Jul 2026
1 Aug 2026
25 Jul 2026
1 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling brick work or stone work in lime of cement mortar and including stacking of materials as directed by the Engineer-in-charge with in a distance of 60 metres (200ft.) | 8.28 | m3 | 1,627.46 | ₹13,475.37 |
| 2 | Dismanting cement concrete or brick or granolithic floor including base concrete and including stacking of dismantled materials as directed by the Engineer-in-charge with in a distance of 60 metres (200ft.) | 10.87 | m3 | 1,922.94 | ₹20,902.36 |
| 3 | Earth work filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 30cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5 m. | 672.22 | m3 | 154.83 | ₹1,04,079.82 |
| 4 | Cartage of ballast, kankar, coal, grit or sand etc including loading and unloading but excluding stacking on pucca roads. | 605 | m3 | 237.49 | ₹1,43,681.45 |
| 5 | providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:5:10 (1 cement : 5 coarse sand (zone-III) 10 graded stone aggregate 40 mm (norminal size) | 32.17 | M3 | 4,889.51 | ₹1,57,295.54 |
| 6 | Brick work with common burnt day ( non modular ) brick of class -150 in foundation and plinth in Cement morter 1:4 (1cement : 4 coarse sand) | 81.06 | m3 | 6,715 | ₹5,44,317.9 |
| 7 | 12 mm cement plaster of mix 1:4 ( 1 cement 4 coarse sand) | 518.71 | m2 | 271.46 | ₹1,40,809.02 |
| 8 | Granular sub-base with Graded material(table -400-1) by mix in place method consruction of granular sub-base by providing close grader on prepared surface, mixing by mix in place metod with vibratory roller to achieve the desired density, comp. as per clause 40 1. | 93.5 | m3 | 3,866.86 | ₹3,61,551.41 |
| 9 | P/Lof polythene etc all comp. | 623.36 | m2 | 15 | ₹9,350.4 |
| 10 | Trimix for c c road etc all comp. | 623.36 | m2 | 89.54 | ₹55,815.65 |
stage.html
html • 0.08 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
Tendernotice_2.pdf
PDF • 1.40 MB
BOQ_2201724.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .