Construction of GP building at Hadugallu GP Thirthahalli taluk Shivamogga District
RDPR/2026-27/BD/WORK_INDENT26653
RDPR/2026-27/BD/WORK_INDENT26653
Open
Buildings
Electronic Documents, First(One Cover)
RDPR Gram Panchayat Office Hadigallu TP Tirthahalli
₹510
₹10,000
22 May 2026
8 May 2026
15 May 2026
Pillars
Walls
For steps
Deduct
Pillars
Basic Rate
Total
Providing and laying in position plain cement concrete for levelling course for all works in foundations. The granite/trap/basalt crushed coarse aggregares abd fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceedig 150mm thickness, well compacted using plate vibrators, including all leads & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) (P.N0.15/2.1.3/ CSR/2023-24)
Mix 1:3:6 (M10) Using 40mm nominal size graded crushed coarse aggregates.
Pillars
I No. 2 Cont'd………….
Basic Rate
Total
Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates I NO 2.2.1 PAGE NO 15 VOL -1
M25 Design mix Using 20 mm nominal size graded crushed coarse aggregates.
Footing
Basic Rate
Total
Add 8% Centring charge
Total
Providing and laying in Reinforced cement concrete for all Sub structures of buildings, irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50m height. The granite/trap/basalt crushed graded coarse aggregates and fin aggregates as per relevant IS Coades machine mixed with super plasticisers, laid in layers, wll compacted usint needlee vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtemances required to complete the work as per technical specifications. (The cost of steel reinforcement & formawork to be paid separately) (P.N0.16/2.4.3/ CSR/2023-24). volume 1
I No. 4 Cont'd………….
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.
Pillars
Basic Rate
Total
Add 70% Centring charge
Total
Providing and laying in position Reinforced cement concrete for all Super structures of buildings, Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) (P.N0. 16/2.5.2/CSR/Volume-1/2023-24)
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.
Basic Rate
Total
Add 50% Centring charge
Total
Lintle
Deduct
Net Qty
Basic Rate
Total
Add 60% Centring charge
Total
Basic Rate
Total
Add 50% Centring charge
Total
Basic Rate
Total
Add 45% Centring charge
Total
Supplying, Fitting and Placing TMT Fe 550 / 550 D & above Reinforcement in Including cost of all materials ,labour cleaning straightening cutting bending hooking lapping /welding joints tying with binding wire /soft annealed steel wire and other ancilary operation complete as per drawing and technical specificeation.(h) ALL other type of structures . (P.N0. 18/2.11a/CSR/Volume-1/2023-24)
a) Footing
b) Pillars
c) P.Beam,beam and slab
Basic Rate
Total
Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (1 Cement : 6 coarse sand) (P.No. 9/5.4/volume 2 SR/2023-24).
Ist Course
2nd course
Deduct
Pillars
Basic Rate
Total
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc, in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5m. (P.N0.34/1.9/CSR SR/2023-24).
Basic Rate
Total
Sub Total
Add 18% G.S.T
Misc and rounding off
Total Rs.
Certificate :-
Certified that I have personally inspected the work spot and preparedthe estimate economically And with safe way of executing thek work.The rates adopted in the estimate is asper CSR Volume-1 and 2 for the year 2021-22. Items incorporated in the estimate for this work are Economically found correct.
Section officer,
piller
crank
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender Document KW2.docx
Tender Document • 0.09 MB
Estimate.xlsx
Tender Document • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .