| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.7 LAccepted-AOC | L-1 | Accepted-AOC accepted | |
| 2 | L-2₹15.2 L+₹47,967.16 (3.26%)Rejected-AOC | L-2 | Rejected-AOC rejected | |
| 3 | L-3₹15.5 L+₹78,273.59 (5.32%)Rejected-AOC | L-3 | Rejected-AOC rejected | |
| 4 | L-4₹15.8 L+₹1.1 L (7.51%)Rejected-AOC | L-4 | Rejected-AOC rejected |
Tender Value
₹13.0 L
EMD Value
₹26,000
Closing Date
5 Aug 2020, 4:00 pmClosed
Executive Engineer
Executive Engineer HPPWD Division Kasauli
C O Jabli Sujji Thari road in KM 0/00 to 6/800 SH C O 6 meter span and 4 meter vent height RCC slab culvert including both side wing wall at RDs 1/950 near Sujji Nallah
2020_PWD_39217_1
3489-99 dated 13-07-2020
Open Tender
Civil Works
Item Rate
90 days
Kasauli
As per tender documents
8 documents required · 8 mandatory
₹500
Yes
EE Kasauli
₹26,000
4 Jan 2021
22 Jul 2020
6 Aug 2020
22 Jul 2020
5 Aug 2020
22 Jul 2020
Amount
Earthwork in excavation for all type of road structures such as retaining wall, breast wall and parapets etc. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiesling / wedging out rocks (where blasting is prohibeted) as per drawing and technical specification true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 305.1(Three hundred Five point One) including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and stacking of materials useful for construction at suitable sites and safe disposal of unserviceable excavated materials in specified manners to dumping site (to be arranged by the contractor) including trimming, dressing of sides and bottom, filling of unevenness blindages, backfilling in trenches with excavated suitable material and finishing of the road to specified dimensions or as directed by the Engineer-in-Charge. All work of excavation by blasting shall be carried out by taking all necessary precautions against soil erosions, damage to hill side, water pollutions etc., and to protect stability of hill side rock. Any loss to the public or private property during the course of execution shall be the sole responsibility of the contractor, which shall have to be duly compensated by him at his own cost of all cases.
Providing and laying plain Cement concretre in 1:4:8 (one cement isto four sand isto eight graded crushed hard stone aggregate 40 (forty) millimeter nominal size) mechanically mixed, vibrated and curing complete in open foundation and plinth for all type of structure including the cost of form work as per drawing and MORD Technical Specification clause 802, 803, 1202 and 1203 (Eight hundred two, eight hundred three, one thousand two hundred two and one thousand two hundred three) or as directed by the Engineer-in-Charge including carriage of materials with in all leads and lifts and other incidentals.
Providing and laying Plain Cement Concrete nominal mix 1:6:12 (one cement isto six sand isto twelve graded stone aggregate 40mm (fourty milimeters) nominal size) Mechanically mixed and vibrated and curing complete in open foundations and plinths for all type of structure including the cost of form work complete as per drawing and MORD Technical Specification clause 802, 803, 1202 and 1203 (Eight hundred two, eight hundred three, one thousand two hundred two and one thousand two hundred three) or as directed by the Engineer-in-Charge including carriage of materials with in all leads and lifts and other incidental charges.
Providing and laying concrete for plain /reinforced concret in open foundation complete as per drawings and technical specifications MORD clause 802,803,1202 &1203 including carriage of materials in all leads and lifts. a)P.C.C 1:3:6.
Providing and laying cement concrete work 1:1.5:3(one cement one point five sand :three graded stone aggregate twenty milimetre nominal size)mechanically mixed and vibrated for compacting concrete to requred strength and curing complete excluding cost of form work and reinforcement for reinforce cement concrete as per HPPWD specification 1990 (one thousand Nine hundred Ninety ) volume-I inlcuding carriage of materials in all leads and lifts and as per the direction of Engineer-in-Charge.Suspended floors, roofs,landing and shelves and their support balcones beams girders bressumers and cantilever upto all floor levels.lientels beams girders etc.
Supplying, fitting and placing HYSD / TMT bar reinforcement (Fe 415) in Sub-structure complete as per drawings and technical specification Clauses 1002, 1005, 1010 and 1202 including cost of wire, cost for cutting, binding and sand strengthening of bars and placing in position complete as per the direction of the Engineer-in Charge including carriage of materials through all modes of transportation within all leads and lifts of materials and other incidentals.
Providing and laying 100mm dia metre PVC pipe for wheep holes complete of approved quality Including carriage of material within all leads and lifts complete as pe the direction of Engineer-in-charge
Backfilling of Granular material behind abutment, wing wall and return wall, breast walls, retaining walls and parapets up to all heights, depths and levels complete as per drawings and MORD technical specification clause 1204.3.8 (one thousand two hundred four point three point eight) , including carriage of all labour equipment and materials to various location of site through all modes of transportations in all leads lifts and all incidental charges.
Lalit Kumar Attri
Lekh Raj Thakur
Lakshay
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .